ML19329F900

From kanterella
Jump to navigation Jump to search
Forwards LER 80-008/03L-0
Date released: 12/09/2019 Download: ML19329F900


LER 80-008/03L-0:on 800606,during Normal Operation,Testing Revealed That Relay 1-247/AO2X in Train B Would Not Drop Out to Initiate Undervoltage Trip Function.Cause Not Determined. Relay Replaced & Tested Satisfactorily
ML19329F905
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 07/03/1980
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19329F905 (2)
Forwards LER 80-008/03L-0
ML19329F899
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 07/03/1980
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19329F899 (1)