ML19329F456
| ML19329F456 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 12/15/1972 |
| From: | Vassallo D US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Roberts C ENVIRONMENTAL PROTECTION AGENCY |
| Shared Package | |
| ML19329F457 | List: |
| References | |
| NUDOCS 8006270491 | |
| Download: ML19329F456 (1) | |
Text
.
..-----.i j
y-y
-,--c--
.l k,
.k.
l
/
- j
.)
,s
., L.
.x.,
m=
a-a~
- ~~
s L
Docket Nos. 50-329 and 50-330 l
'l Mr. Craig Roberts i
Ranvironmental Protection Agency Room 18-81, Parklawn Building IHIS DOCUMENT CONTAINS-i 5600 Pishers Iene POOR QUAUTY PAGES Bockville, Maryland 20852
Dear Mr. Roberts:
The Atomic Rnergy Cammission has issued Construction Permits Nos. CPPR-81
.j and CPPR-82 to Consumers Power Company authorizing construction of two pressurized water nuclear reactors designated as the Midland Plant, Units 1 and 2, on the applicant's site on south shore of the Tittabawassee River in Midland Township, Midland County, Michigan. The construction permits have been issued pursuant to an Initial Decision by the Atomic Safety and Licensing Board.
Two copies each of the construction permits, the related notice which has been forwarded to the Office of the Pederal Register for publication, and the Initial Decision are enclosed.
i Sincerely, l
D. B. Vassallo, Chief Pressurized Water Reactors Branch No. 1
. Dire.ctorate of Licensing
Enclosures:
~ DISTRIBUTION e
'1.
Construction Permits Dockets (2)
Nos.'CPPR-81 and CPPR-82 RP Reading 2.
Federal Register Notice PWR-1 Reading 3.
Initial Decision EIGoulbourne (2) cc: Mr. Donald Walgren, Region V Ravironmental Protection Agency 7 N. Wacker Drive j
Chicago, I111acis 60606 1
i CRESS AD:PWR L:PWR-1 Mk 2087-08 7'[f 2011-26 Gou,_ rue:bs Bas 3 allo l
11-15-72
-2 11-f{-72
]
l
~
roe. AEColts (Rev. 9-53) AICM 0240 a u s coverwe=r mNrina orsics ts7 3 446 -t 54
~~