-_... - -.-

. '.4 3

4,,

UNITED STATES E

  1. 5 ATOMIC ENERGY COMMISSION 5' & -EU-f ]
  • )

WASHINGTON. D.C. 20145

,.. p gp Daccuter 19, 1973 Director office of the Federal Register flational Archives and Recordo Service tJanhington, D. C.

20408

Dear Sir:

\\

~

Attached for publication in the Federal Register are an original and two certified copies of a document entitled:

C0".SGES PCWER CC:GATI F.CtITICfffC3 07 02LER TO DIL"J CAL"53 Publication of the above document at the earliest possible date would,

~ ' ~

he appreciated.

Sincerely, THIS DOCUMENT CONTAINS POOR QUAUTY PAGES Faul c. sender secretary of the Cocnission i

Enclosures:

Original and 2 certified copics 1DoIet Clerk (Dir. of Reg.)

hec:

Information Services Legal Files (OGC)

Office of Congressional Relations GT Files (SECY)

Public Proceedings Branch (SECY)

Go'ffttOt't3 "9

8006250l}g

UNITED STATES OF AMERICA ATOMIC ENERGY COR1ISSION e

In the Matter of Construction Permit CONSUMERS POWER COMPANY Nos. 81 and 82 (Midland Plant, Units 1 and 2)

)

_ MODIFICATION OF ORDER TO SHOW CAUSE I

~

By Order dated December 3,1973 CONSUMERS POWER CO., 212 West Michigan Avenue, Jackson, Michigan ("the licensee") was ordered to show cause why all activities under construction permits Nos. 81 and 82 should not be suspended pending a showing by the licensee that it is in

~

compliance with the Commissien's regulations pertaining to quality assurance and that there is reasonable assurance that such compliance

~

will continue throughout the construction process. A further require-ment of the December 3,1973 order continued in effect, a suspension of all cadwelding operations at the plant site, pending a further order and determination by the Director of Regulation.

II i

On December 6 and 7,1973, a special inspection was conducted to determine the status of the licensee's corrective actions with respect to previously identified quality assurance program deficiencies and

~

specific, apparent violations fdentified with cadwelding operations.

As a result of this inspection it has been determined that the licensee

$O09 pt%

8 on- - --

bc-u W u.. T>(

8 f,

  • now has appropriate procedures for q,adwelding operations and that all cadweld inspection personnel have been appropriately trained.

Inspection Report Nos. 050-329/73-11 and 050-330/73-11 provide the detail backup information of this inspection. Copies of these reports are on file in Comission's Public Document Room at 1717 H Street, N.W., Washington, D.C.

20545.

~

III.

In view of the foregoing and pursuant to the Atomic Energy Act of 1954, as amended, the regulations in 10 CFR Parts 2 and 50, and the Order to Show Cause of December 3, 1973 addressed to the licensee, IT IS HEREBY DETERMINED THAT:

The public health, interest or safety does not require the continued suspension of cacwelding activities at the plant site; AND IT IS HEREBY ORDERED THAT:

Effective this date the Order to Show Cause of December 3,1973 is

~

modified to delete the prohibition therein on the resumption of cad-welding operations at the site. All other provisions of that order shall remain in full force and effect.

l

. Man zing Director of Regulation Dated at Bethesda, Maryland this 17th day of December,1973.