ML19329F116
| ML19329F116 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 01/27/1969 |
| From: | Boyd R US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Anthony Giambusso US ATOMIC ENERGY COMMISSION (AEC) |
| References | |
| NUDOCS 8006200647 | |
| Download: ML19329F116 (1) | |
Text
l
~ - -.., _ _,.
w _... q -
(
\\
t
\\
Dis tribution:
RLRead(ingSuppl,= A RPB-1 Reading 3
[()""'3 R. S. Boyd
- 3 58 m 27s D. R. Muller N. Blunt A. Giambusso, Assistant Director for Civilian Power Division of Reactor Development and Technology 7ACILITT LICENSE APPLICATION FILED BY THE CONSUMERS POWER COMPANY POR THE MDLAND PLANT, UNITS NOS.1 AND 2 I am forwarding a copy of a facility license application, including Volunes I and II of the Preliminary Safety Analysis Report filed by Consumers Power Company for the proposed construction and operation of two pressurized water nuclear reactors, designated as the Midland Plant, Units Nos.1 and 2, to be located in Midland Township, Midland County, Michigan. The reactors are each designed for initial operation at approximately 2,452 thermal megawatts with a net electrical output f
of approximately 1325 megawatts.
A Supplement to Section 2C of the Preliminary Safety Analysis Report is also enclosed.
Please review the Pre 14=4pary Safety Analysis Report,and provide Mr. C. A. Lovejoy, Office of the Controller, with your comments as to the reasonableness of the first core fuel requirements for a reactor of this design and power level.
Please send us a copy of your comments.
un.- agned LX o
D,B. AIullec f Roger S. Boyd, Assistant Director for Reactor Projects Division of Reactor Licensing Enclosures :
PSAR, Vols. I and II Suppl. to Sec. 2C of PSAA ec:
C. A. Lovejoy, OC THIS DOCUMENT CONTAINS POOR QUALITY PAGES
~
omer >
RLIRP.R 1
- - BL.tERB-1 RL:RPB-1 Rbp)lg Cy\\
d
-i Mnphy Muller sunn a r >
nti om >
.1/17/f19 -
..11.M]69
_1L;.:L69.. _
Forum AEC-5te (Rev.9-53) AECM 0240[ k f as sovse i,ss o--tse.eir 800620'0
-