ML19329E913

From kanterella
Jump to navigation Jump to search
Forwards Nonconformance Rept for Oct 1976 Per 730326 Condition 4 of Memorandum & Order ALAB-106 & Amend 1 to CP
ML19329E913
Person / Time
Site: Midland
Issue date: 11/19/1976
From: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Volgenau E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML19329E914 List:
References
ALAB-106, HOWE-169-76, NUDOCS 8006180766
Download: ML19329E913 (1)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

O so 3**

o 3o-aa Vice prosjgeng Generaf offices: 212 West MicNgen Avenue. Jackson, MicN98n 49201 November 19s 1976 Howe-169-76 L3tilater! C00ket

-~ ]

kr THIS DOCUMENT CONTAINS g

POOR QUAUTY PAGES J

  1. 0Vg41876mb 1

3 Dr. Ernest Vogenau, Director Office of Inspection and Enforcement US Nuclear Regulatory Commission

%I 4 Washington, DC 20555 met - AIAB-106 MOFDILY NONCONFORMANCE REIORT FOR OCTOE:21976 In accordance with Condition 1+ of Memorandum and Order AIAB-lO6 dated March 26, I

1973 and Amendment No.1 of the Midland Plant Construction Permit, enclosed are ten (10 copies of the nonconformance report for October 1976. The report con-sists of copies of Bechtel Nonconformance Reports, Quality Assurance Discrepancy

%)

Reports, and Quality Audit Findin6s, all sheets frca the Bechtel Nonconformance Report Log and Status Book which reflect open Bechtel NCR's, and Consumers Power I

Company Nonconformance Reports written or closed during the month.

(b,k-u~

CC: JGKeppler, USNRC C'

/

?!

S(

7 $

Y3 i

  1. y a

tt s

a w

a p) r:r

(

11 Ifs'd 8006180 g