Forwards Revision of Util 761109 Proposed QA Program for Acceptability Review.Lists Specific Revisions
ML19329E875
Person / Time
Site: Midland
Issue date: 03/23/1977
From: Bauman R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Boyd R
Office of Nuclear Reactor Regulation
Shared Package
ML19329E876 List:
References
3349, NUDOCS 8006180708
Download: ML19329E875 (2)


Text

-

c

\\

s CGGS!!m3fS prnyar Hegulatory Docket File q

M:npan'!

General offices: 212 West Michigan Avenue. Jackson, Michigan 49201. Area Code 517 788-0550 March 23, 1977

h. ' f,

c

(/

Director of Nuclear Reactor Regulation Atta: Mr Roger Boyd, Director g

M g,QOgj / -

Division of Project Management pt } j p

US Nuclear Regulatory Commission cs e

Washington, DC 20555

\\

N' D

MIDLAND PROJECT D

M DOCKET NOS 50-329, 50-330 JlD QA REGULATORY GUIDE RESPONSES FILE: 0505.2 SERIAL: 3349 On November 9,1976 ve submitted a proposed " Quality Assurance Program" descrip-tion to the Director of Nuclear Reactor Regulation with the request that it be evaluated as to acceptability. In a November 26, 1976 letter from S A Varga to S H Hovell the NRC indicated that the information provided by the November 9 letter represented an acceptable program for the design and construction of the Midland Plant Units 1 and 2.

Subsequent to issuance of the November 9 letter, Consumers Power has had cause to modify and clarify certain positions taken.in the Quality Assurance Program description. Therefore, attached to this letter is a revised Quality Assurance Program description which is submitted for NRC review as to the acceptability. Following is a listing of the changes made to the program description contained in the November 9.1976 letter:

1.

Page 1, Item 1 has been changed to indicate that the revision of the Con-su=ers Power Topical Report to be implemented is Revision 5 in lieu of Revision h.

The reason for this change is that Consumers Power has received approval for implementation of its Topical Report No. CPC-1A, Revision 5 2.

The titles of Sections I - D, E, F, G, H, I, J and K have been revised to identify the date or revision number of the Regulatory Guide which will be implemented (subject to interpretations and alternates) for the Midland Project. The reason for this change is that when this program was origin-ally developed very few of the Regulatory Guides involved has been revised.

Since many of these Regulatory Guides have now been revised, it is believed necessary to indicate which Regulatory Guide revision is applicable in each case.

3.

Page 12 of the program description hrss been revised to include the informa-tion submitted to the NRC on Nove=ber 10, 1976 in response to NRC Staff questions.

8006180 % [

2 i

h.

On pages 14 and 15, a new Section I - L has been added to: a) explicitly describe commitments to revisions of Regulatory Guides or ANSI Standards which deviate from those contained in the " WASH" documents, and b) describe which drafts of the Draft ANSI Nk5.2.12 and ANSI Nh5 2.13 Standards will be implemented. These drafts are different from the " WASH" document. They are, however, the drafts which Bechtel plans to implement. It should be noted that these versions are identical to those contained in Consumers Power Quality Assurance Topical Report - Policy No 2, Section 3.1 d, and, therefore, Consumers Power presumes the acceptability of these draft stan-dards by the NRC Staff.

5 Page 15, No III has been revised to change the effectivity date for the Consumers Power Topical Report to December 2, 1976. This revision is based on the change from Revision h to Revision 5 as described in Iten No 1 above.

The commitment for Bechtel activities has been changed from April 1,1977 to May 15, 1977 While considerable effort has been expended attempting to meet the April 1,1977 date we find that implementation of all the Bechtel commitments by that date is not feasible.

Please review the attached revised " Quality Assurance Program" description and provide an evaluation as to its acceptability with the same understanding as that provided for the November 9, 1976 aubmittal, ie, the effectivity date for imple-mentation of the Babcock & Wilcox commitments vill be provided after Revision 3 to the Babcock & Wilcox Topical Report has been approved by the NRC.

m/a R C~Bauman Project Engineer RCB/HWS/fw

,,