Summary of 731108 Meeting W/Util & Bechtel Corp in Bethesda, MD Re Radiography of Containment Liner Plate Welds Not in Compliance W/Psar
ML19329E857
Person / Time
Site: Midland
Issue date: 11/27/1973
From: Mackay S
US ATOMIC ENERGY COMMISSION (AEC)
To: Deyoung R, Klecker R, Miraglia F
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8006180653
Download: ML19329E857 (2)


Text

-

p rv yf j ;y 7 wm.mp~

,, g -

.m.7

.e n ';

p

~

/

NOV 2 71973 1

DOCKET HOS.:

5'0-329 AND 50-330 THIS DOCUMENT CONTAINS POOR QUAUTY PAGES APPLICANT :/ CON 2)MEP.S POWER COMPANY

'I FACILITY

MIDLAND PLANT, UNITS 1 AND 2 SUmARY.0F MEETING ON RADIOGRAPHY OF COHTAINMENT LINER PLATE WELDS Representatives of the Regulatory staff, Consumers Power Company and Bechtel Power Corporation met in Bethesda, Maryland on November 8,1973.

An attendance list is enclosed.

The applicant requested this meeting in order to inform the Regulatory staff that the containment liner plates that had been welded together thus far had not been radiographed to the extent called for in the Preliminary Safety Analysis Report (PSAR) and to discuss with the staff the current codes and standards governing such radiography.

Approximately twenty percent of all liner plate welding has been completed, including the shop welds and some field welds. None of the liner plate has been erected. Leak-chase channels have been welded in place over the liner plate welds and the welds have been leak-tested.

The-completed welding.was performed in the hat position and the work of each welder was radiographed to the extent of 10% of the first 10 feet of weld and 45 thereafter. The PSAR calls for the work of each welder in each welding position to be radiographed 10% of the first 4

10 feet and 10% at rendas thereafter. Regulatory Guide 1.19 calls for the work of each welder in each welding position to be radiographed for the entire first 10 feet and then 1 foot in each additional 50 foot increment. The ASME Boiler and Pressure Vessel Code Proposed Standard for Concrete Reactor Vessels and Containments,Section III Division 2 Paragraph CC5520 c411s for radiography of 1 foot of weld in the first 10 feet and 1 foot in each additional 50 foot increment. Therefore, although radiography was generally perfomed to a greater extent than called for by the proposed standard and by the Regulatory Guide (4%

rather than 2%), it did not fulfill the requirement of the PSAR.

e l

l

  • ~j, 5,[

5

- A..

p..' b,,..

  • ~~*^....--e

.. ~

w' e c-

]. '

g gm

.b,., e ~ -

qq 2; 3 2,',,wm z

1

_ _ _ _. _ _. _. _ _ _ I,

,..t::, g:,

z~r m ~ w ~ m new g m ;~ g

,.. - w

..- m

,..../ ~.

' 07,

r~

n ~ ry,.zyn.g._

=

, -c

~

,~5 y

.b!

h,

.7=

..,,..,._....a.. '..,

Meeting Sumary

.J 2-i NOV 2 71973 s

The applicant will supply further information for our evaluation and will propose a change to the PSAR that will include requiremertts consistent with the latest industry standards and Regulatory Guides.

Original Signed S. D. MacKay Project Manager Pressurized Water Reactors Br. No. 4 Directorate of Licensing

Enclosure:

Attendance List i

i DISTRIBUTION:

Dockets (2)

AEC PDR Local PDR RP Rdg L Rdg PWR-4 Rdg RCDeYoung_

RWKlecker R0 (3)

TR AD's TR BC's RP AD's RP BC's REMMEN FMiraglia SDMacKay ACRS (16)

RS (3)

JHendrie EIGoulbourne DKartalia f

~

omes>

PWR-4 SDMMMhf

essmess, 11/ Z h /73 nn, l

% ascumin wu ascu one

- - ~ _.

wan

i..w l

.=

-.. -.. -.. ~. ~ _. -

.a