THIS DOCUMENT CONTAINS POOR QUAUTY PAGES i-NOV 141973 DOCKET NOS.:
0,-J30 APPLICANT : CONSUMERS POWER COMPANY (CPC) 1 FACILITY
- MIDLAND PLANT
SUMMARY
OF MEETING HELD OCTOBER 31, 1973 CN QUALITY ASSURANCE Representation of Consumers Power Company and the Bechtel Power Corporation met with members of the Regulatory staff in Bethesda, Maryland to discuss the applicant's proposed response to the Atomic and Safety and Licensing Appeal Board's Memorandum and Order (ALAB-152) dated October 5,1973.
/
The applicant and Bechtal presented a draft of " Supplementary Requirements to Field Inspection Manual Procedure C-1" dated October 19, 1973, and a revised Field Quality Control organization chart dated October 19, 1973.
Based on a first reading of the material, the staff commented that the proposed revisions did not appear to be fully responsive to the bosrd's order. This impression is based on the following points:
1.
Field Inspection Manual Item 3e states in part that recommendations for salary increases for Quality Control Engineers at the job site are channeled through the Project Superintendant. This gives the impression that the Project Superintendsat might exercise some control over these increases and thereby compromise the independence of these Quality Control Engineers.
Item 3d states that "The Project Superintendant shall be responsible for providing day to day project direction to the Project Field Quality Control Engineer..." It should be sufficient to provide coordination of QA activities. Day to day project direction implies an encroachment upon the independence of the Project Field Quality Control Engineer.
8006180[fM h
/
2.
Ornanization Chart The chart lacks clarity because there is no solid line to indicate the Project Field Quality Control Engineer's line of primary responsibility. Furthermore, the line connecting the Project Field Quality Control Engineer to the Project Superintendant indicates that the Project Superintendant issues to the Field Quality Control E==4===r " directions and i==treeti- - ear==A with = r"ination_
o l'
NOV 14 1973 2-Meeting Susanary of day to day project operation." These directions and instructions are not consistent with the independence of the Quality Control Engineer sought by the board.
The applicant assured the staff that their comments would be considered in the final revisions to the Quality Assurance Manauls and the Organisation Chart. The revised material is to be submitted to the staff by November 9,1973.
x Original Signed I
\\
S. D. MacKcy. Project Manager Pressurized Water Reactors Br. No. 4 Directorate of Licensing
Enclosures:
- 1. Draft Supplementary Requirements to Field Inspection Manual Procedure G-1 dated October 19, 1973.
- 2. Field Quality Control Organization Charc dated October 19, 1973.
- 3. Attendance List DISTRIBUTION:
Dockets (2)
JCostello, RO AEC PDR JHenderson, RO LOCAL PDR L Rdg
/ RP Rdg
/
PWR-4 Rdg
/
RCDe 'oung ASchwencer
/
RWKlecker
/
RO (3)
TR BC's SDMacKay R3ButEk FMiraglia EIGoulbourne RP AD;s RP BC's l
DKartalia RFraley (16)
JHendrie' MPeranich SBryan l
0FFICE >
I.U.k
$fN
{
sunnmE >
- kmE...
I 11/ /
/ 72 DATE>
Forms AEC-SIS (Rev.9-53) ABCM 0240 ero ess-to-sues-eeM7s
3
~'s ENCLOSURE 3 ATTENDANCE LIST NOV 141973 Atomic Energy Commaission S. D. MacKay W. Massar M. Paranich W. Vetter, RO:III S. r,ryan J. Costello R. Vollmer J. Henderson BECHTEL CORPORATION M. Krout L. Scoville D. Johnson S. Bernsen Constaners Power Company W. Kessler G. Keeley J. Bacon e
~
~
o 1:. A F.
.l._
n,
.i.'.a_.w... EC t S i +:c1A L PR OvunOxs
.Bechtel PowerCorporation
, NOTICE S F / I'S P I/ 3 R EV.
O.
7?.20 Interoffice Memorandum N
PFQCE, Job No. 7220 om October 19, 1973 Supplementary Requirements to D. R Johnson Field Inspection Manual Procedure G-1, Job No. 7220 SF Power Division Cons truction Dept.
Job No. 7220 Project Team Holders 2 45 Mis sion, St.
y of the Field Inspection Manual and 7th Floor B2 Quality Control Notices Manual.
E :st.
5546 The following special provisions for the Midland Project have been established as supplementary requirements to the subject Field Inspection Manual Procedure G-1.
These sp.:cial provisions were initiated at Dcchtel Construction Manancment's request, with the full concurrence of Bechtel Project Management and Consumers Power Company.
These same special provisions shall also apply to each of the other procedures contained in the Field Inspection Manual wherever applicable.
i
'l.
SCOPE OF THE QUALITY COPTROL PROGRAM The requirements for construction quality control contained in the Field Inspection Manual and Quality Control Notices Manual shall be applied to all "Q" listed materials and equipment. Application of these requirements to other permanent or temporary plant material: and equipment shall be as directed by nechtel Construction Management and Consumers Power Company.
liEFINITIONS 'Ol' R EPO!!_ TING R ESi)O_NS__iblLITIES 2.
a.
Project Direction: l >irections and inr t ructions concerned with coordination of day to day proje.:t operations.
b.
Functional Directium The positi m ennudatory instructions and clirections given to control a f uncti m or activity.
Functional amt Administrative 1)irection: The positive c.
mandatory in:structions and directions given to control i
a function or. activity including rc.a ponsibility for hiring, training, as s ig nme:0.. performance review and salary.
C
m 4
~r O
SF/ PSP //3, REV. O, T220 Oc tobe r ~ 19, 1973 Page 2 3.
ADMINISTRATION OF TIIE FIELD Ol'ALITY CONTROL PROC! TA a)
The Chief Field Quality Control Engineer shall be responsible for the functional direction, hiring, assignment. training and dismissal of the Quality Control Engineers at the jobsite.
This responsibility shalI be exercised through and upon the recommendations of-the Ann A rbrir Quality Control Supervisor and Project Field Quality Control Engineer, see Figure 1.
b)
The Chief Field Quality Control Engineer shall be responsible for performance evaluation and initiation of salary increases for the Ann Ar'bo'r Quality Control Supervisor and Project Field Quality Control Engineer.
c)
The Project Field Quality Control Engineer shall be responsible for performance evabsations and recommendations for salary increases for the Quality Control Engineers at the jobsite. These recommendations are channeled through the Project Superintendent to the Manager of Construction who assure that any salary increaces are within the limit's established by Bechtel personnel policy for the various pay grades and within government wage guidelines. Such increases may be disapproved only if 'they do not fall within such policy limits and guidelines. If an increase is disapproved, the disapproval will be reviewed by and subject to the concurrence of the Chief Field Quality Control Engineer.
d)
The Project Superintendent shall be responsible for providing day to day project direction to the Project' Fichl Cuality Contre,1 Engineer. and coordination of the field Quality Control organization's activities with the activities of the other jobsite construction forces, see Figure 1.
L.-
L
,y j
SF / PSP //3, IIEV. O, 7220 Octobe r 19, 1973 l' age 3 4
PROJECT FIE LD QUA LIT Y CONTR OL ENGINEER'S STOP WORK A UTIIORITi.
a)
The Project Field Quality Control Engineer is responsible for supervision of the Construction Quality Control program at the jobsite to assure that the work falling. under the scope of the program is properly inspected and documented. The Project Field Quality Control Engineer receives administrative and technical direction from the Chief Field Quality Control Engineer fcr the preparation of Field Inspection Plans. The Chief Field Quality Control Engineer provides this direction through Master Inspection Plans which are prepared by home office staff discipline Quality Control Engineers based on the program criteria. The Project Field Quality Control Engineer ha.s authority to stop work. This authority,, communicated through the Project Superintendent. shall require immediate stoppage of work operations and other. construction activities determined to be improperly controlled br otherwise in nonconformance with abe quality regtiirements of the applicable design specifications. drawings and other
. program criteria. Similarly, the Pt eject Field Quality Control Engineer has the authority to stop work if a designated quality control inspection. examination or test operation is bypansed to the point svhere the work is no longei capable of being properls inspected. Such stop work orders cannot be countermanded by the Project Superintendent, b)
The Project Ficid Qu tity Contrni r neineer has the same authority as stated in (a) above to stop the work of subcontractors.
c)
The Project Field Qu tlity Control Engineer shall be resp msibic for reviewing and a pproving field prepared requisitions for "Q" list materi: tis services and equipment.
He shall assut c the requisitions anel resultant field purchase orde rs contain a Proj.'et Engineerine upccitication l
gove rning' applicable supplier Q A requirements. The Project Field Quality Control Engin :e r has the authority to stop the phccment of field purch tee orders for "Q" list material, services and equipment if the procurement
. docunients clo not con'ain a Project Ent ineering prepared I
specific ilion ::m<arnin., applicabic mpplier QA requirements.
r w.-s
m S F / PSI) Il3, REV. O, -7220 Octobe r 19, l973 Page 4' 5.
INSPECTION BY FIELD ENGINEERS AND QUALITY
' CONTRO L ENGINEEllS The Project Field Engince:r shall be responsible for assigning Field Enginects to perform in process, production control, ins pection activities. The Project Field Quality Control Engineer shall be responsible for providing quality control surveillance over the inspections performed by Field Engineers as well as assigning Quality Control Engineers to perform all quality verification ins pec tions. In process, production control inspections and quality verification inspections shall be predetermined and identified on the Master Inspection Plans prepared by San Francisco home office staff Cuality Control Engineers and approved by the Chief Field Qualitif Control Engineer.
6.
SURVEILLANCE INSPECTION OVER WORK PERFORMED BY
_S UBC ONTR AC TORS It shall be the responsibility of the Project Field Quality Control Engineer to' assure that the sork performed by on site subcontractors is done in full compliance with their Bechtel approved Ouality Assurnucc/ Quality Control manuals and other quality requirements of the subcontract documents. This assurance shall be provided by means of surveillance inspection performed by Fichl Quality Control Engineers over the ins pection and/or v/oric performed by s ubc ontrac tors.
7.
TESTING LADOR ATORIES AND INSPEC' LION SUBCONTRACTORS The Project Fiebl. Quality Control Engineer ahall be responsible for assinning Field Quali:y Control Engineers to provide Junctisuril technical dircellon over the v.orh performed by testing laboratories and inspection.!ubcontractors, see Figure 1.
Please direct.iny questions yr a ma y have r.
n raing these special provisions to the Am Arbor Quality Control Super 7 sor.
1 t \\,
.1 4
.* 4 },
/
Dondl<l R. Johnson v
Chief sci. 'd 'lnality Control Engineer
. ~..
,a
i FJELD QUALITY CONTROL 1
o MIDLAND PROJECT f;
JOB NO. 7220 CHIEF FIELD
- QUALITY CONTROL ENGINEER
- I l'
]
'T-PROJECT ANN ARBOR. /
':UPSRINTENDENT OUALITY CONTROL SUPERVISOR l
l I
I I
g I
I CONTRACTS PROJ ECT PROJECT PROJECT MATERIAL FIELD T".t!N!STR ATOR SERVICES FIELD SUPERVISOR SUPERINTENDENT FIELD SUPERVISOR ENGINEER i
OC ENGINEER 1
I i
l TEST I
LABO ATORY I
I l
..)
i FIELD ENGINEERS SUPERINTENDENTS ENGINEERS civil DISCIPLINE. AREA civil ELECTRICAL
& CRAFT ELECTRICAL MECHANICAL SUPERINTENDENTS MECHANICAL LEGEND:
WELDING WELDING
- PROJECT DIRECTION: DIRECTIONS AND INSTRUCTIONS CONCERNED WITH COORDINATION OF DAY TO DAY PROJECT O
~ * - - - - - - - - F UNCTIONA L DIR ECTION: THE POSITIVE MANDATORY INSTRUCTIONS AND DIRECTIONS GIVEN TO CONTROL A FUNCTION OR ACTIVITY.
- - - - - -- -- FUNCTIONAL AND ADMINISTR ATIVE DIR ECTION: THE POSITIVE MANDATORY INSTRUCTIONS AND CLRECTIONS GIVEN TO CONTROL A FUNCTION OR ACTIVITY 1%CLUDING RESPONSIBILITY FOR HIRING. TRAINING, ASSIGMJENT, PERFORMANCE REVIEW AND SALARY.
FUNCTIONAL AND ADMINISTRATIVE DIRECTION AND PROJECT DIRECTION.