ML19329E840

From kanterella
Jump to navigation Jump to search
Notification of 730509 Meeting W/Util,Bechtel Corp & B&W in Bethesda,Md to Discuss Status of Outstanding Items from CP Review,Current Generic Items & Project Schedule.Agenda Encl
ML19329E840
Person / Time
Site: Midland
Issue date: 04/15/1973
From: Bernero R
US ATOMIC ENERGY COMMISSION (AEC)
To: Schwencer A
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8006180636
Download: ML19329E840 (3)


Text

, _.

~

A 3

UNITED STATES ATOMIC ENERGY COMMISSION 1 *(

J*

wAssiscTon, o.c. zos4s

%,Y 5

e.,,,,, p APR 1 5 1973 D;cket No. 50-329 and 50-330 A. Schwencer, Chief, Pressurized Water Reactors Branch No. 4, L FORTHCOMING MEETING WITH CONSUMERS POWER COMPANY Tine and Date:

8:30 a.m. Uednesday May 9, 1973 Location:

Room P-ll8 Bethesda, Maryland

Purpose:

This meeting is to discuss status of items outstanding from' the construction permit review, current generic items, and the proj ect schedule. The attached agenda lists the technical topics to be covered. More detailed discussion is expected on items 1, 6, 8, 9, 11, 19, 22, 23 and 24.

Participants:

Consumers Power Company Bechtel, Babcock & Wilcox AEC (RMBernero, FMiraglia et al)

.r W

Robert M. Bernero, Project Manager Pressurized Water Reactors Br. No. 4 Directorate of Licensing

Enclosure:

Agenda ec: JHendrie TR Assistant Directors RCDeYoung RP Assistant Directors RWKlecker Receptionist PWR Branch Chiefs FMiraglia RFFraley, ACRS R0 (4) 8006180[36

~

,]

~,

)

AGENDA MIDLAND 1 AND 2 POST CONSTRUCTION PERMIT MEETING 1.

Onsite meteorology program 2.

Subsidence surveillance program 3.

Review of Probable Maximum Flood calculation 4.

Preoperational environmental monitoring program 5.

Modification of water intak'e to reduce velocity 6.

Relocation of 138 KV South Dow line 7.

Detailed criteria and procedures for installation of protection and emergency power systems 8.

Use of two emergency diesels to serve two plants 9.

Use of a single Borated Water Storage Tank to serve two planta

10. Diverse reactor trips
11. Hydrogen suppression system
12. Fuel element failure detection system
13. Reactor coolant leakage detection system
14. Seismic instrumentation system
15. Con,tainment isolation sealing
16. Sealed Compartment for reactor building sump line
17. R&D report on process steam gamma monitor
18. Toxic gas in control room
19. Consideration of cooling pond against Safety Guide 27 criteria
20. Effects of failure of non-Category I equipment
21. High energy line rupture out-ide containment

..~...,.-_ _ __

,Z~,..

  • r w~

s

.. e

2 O

~

\\

22. Core flooding tank line break
23. Operating crew. size
24. Organizational status, particularly with regard to the new Bechtel office.
25. Status of reference topical reports i

h,

'%4, r_9

~'

i*['wa.

4 '

l ' ' * 'e ?._.

e A,_

4