ML19329E840
| ML19329E840 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 04/15/1973 |
| From: | Bernero R US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Schwencer A US ATOMIC ENERGY COMMISSION (AEC) |
| References | |
| NUDOCS 8006180636 | |
| Download: ML19329E840 (3) | |
Text
, _.
~
A 3
UNITED STATES ATOMIC ENERGY COMMISSION 1 *(
J*
wAssiscTon, o.c. zos4s
%,Y 5
- e.,,,,, p APR 1 5 1973 D;cket No. 50-329 and 50-330 A. Schwencer, Chief, Pressurized Water Reactors Branch No. 4, L FORTHCOMING MEETING WITH CONSUMERS POWER COMPANY Tine and Date:
8:30 a.m. Uednesday May 9, 1973 Location:
Room P-ll8 Bethesda, Maryland
Purpose:
This meeting is to discuss status of items outstanding from' the construction permit review, current generic items, and the proj ect schedule. The attached agenda lists the technical topics to be covered. More detailed discussion is expected on items 1, 6, 8, 9, 11, 19, 22, 23 and 24.
Participants:
Consumers Power Company Bechtel, Babcock & Wilcox AEC (RMBernero, FMiraglia et al)
.r W
Robert M. Bernero, Project Manager Pressurized Water Reactors Br. No. 4 Directorate of Licensing
Enclosure:
Agenda ec: JHendrie TR Assistant Directors RCDeYoung RP Assistant Directors RWKlecker Receptionist PWR Branch Chiefs FMiraglia RFFraley, ACRS R0 (4) 8006180[36
~
,]
~,
)
AGENDA MIDLAND 1 AND 2 POST CONSTRUCTION PERMIT MEETING 1.
Onsite meteorology program 2.
Subsidence surveillance program 3.
Review of Probable Maximum Flood calculation 4.
Preoperational environmental monitoring program 5.
Modification of water intak'e to reduce velocity 6.
Relocation of 138 KV South Dow line 7.
Detailed criteria and procedures for installation of protection and emergency power systems 8.
Use of two emergency diesels to serve two plants 9.
Use of a single Borated Water Storage Tank to serve two planta
- 10. Diverse reactor trips
- 11. Hydrogen suppression system
- 12. Fuel element failure detection system
- 13. Reactor coolant leakage detection system
- 14. Seismic instrumentation system
- 15. Con,tainment isolation sealing
- 16. Sealed Compartment for reactor building sump line
- 17. R&D report on process steam gamma monitor
- 18. Toxic gas in control room
- 19. Consideration of cooling pond against Safety Guide 27 criteria
- 20. Effects of failure of non-Category I equipment
- 21. High energy line rupture out-ide containment
..~...,.-_ _ __
,Z~,..
- r w~
s
.. e
2 O
~
\\
- 22. Core flooding tank line break
- 23. Operating crew. size
- 24. Organizational status, particularly with regard to the new Bechtel office.
- 25. Status of reference topical reports i
h,
'%4, r_9
~'
i*['wa.
4 '
l ' ' * 'e ?._.
e A,_
4