Deficiency Rept Re Incomplete Steam Generator Weld Matl Records.B&W Reported on Subj Investigation to AEC on 730130. Evidence Now Shows Welds to Be of Adequate Strength & Fracture Toughness
ML19329E733
Person / Time
Site: Midland
Issue date: 02/12/1973
From: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
References
NUDOCS 8006170890
Download: ML19329E733 (2)


Text

_ - _ _ - . -_-

.. o '. n n (()R Gu fr- / 4 <LJ prh

COIISum8tS PD'l10T siepeien M. w...es v,ee pres.aent

@Q@y Generea Offices: a.. n. ecnegan Avenue. Jackson Macn6gan 4920t February 12, 1973 MIDIJJ D PIJJ:T Steam Generator Ueld Records AEC Docket Ucs. 50-329, 50-330 Mr. F. Kruesi, Director Directorate of Regulatory Operations U. S. Atomic Energy Co= mission Washington, D. C. 20545

Dear Mr. Kruesi:

This letter, submitted pursuant to 10 CFR 850.55(e)(3), vill confirm our Mr. Willica E. Kessler's January 16, 1973 telephone report to Mr. Walt Vetter of your Region III office concerning an item of vendor code noncompliance which could be considered reportable under revised 10 CFR 550.55(e)(1)(1).

The item of nonco=pliance in question, first noted in a Consumers Power Company QA audit conducted in Babcock & Wilcox's Barberton facility, consisted of incomplete documentation of the strength and fracture toughness of material used in making repair velds on three of the Midland Plant steam generators. While the documentation vould have satisfied the 1965 vercion of AS:IE Code Section III, it did not satisfy the 1968 revision of the Code.

After naking an investigation, ELW prepared a report on the matter, which it delivered to Fir. R. H. Engelken of your staff during a meeting on this subject in Bethesda, Maryland on January 30, 1973.

That report is incorporated herein by reference.

8008170 878 S fp h C/E'

' " ~

o , ,~. r' Mr. F. Kruesi, Di. 2 tor 2 Midland Plant - Steam Generator tield Records February 12, 1973 As more fully deceribed in the attached memorandum by our metallurgical engineer, Mr. A. John Birkle, we conclude that 3?nT has

' now assembled sufficient evidence to chev that the steam generator repair velds are of adequate strength and fracture toughness. -

i Yours very truly,

- 'l a,um c.

~sd .

Y~sid h

~~

~gt, I WEK/dm (j Uk ( < $