I),
)
,r-
'b Appendix A NOTICE OF VIOLATION Consumers Power Company Docket No. 50-329 Docket No. 50-330 Based on the results of NRC inspection on March 21-23, 1978, it appears that certain of your activities were in noncompliance with NRC requirements as noted below.
Items 1 and 2 are considered infractions and item 3 is considered a deficiency.
Son.rary to the requirements of 10 CFR 50, Appendix B, 1.
e Cx iterion IX, and Paragraph 5.2 of the Consumers Power Company Quality Assurance Program for Design and Construction, Procedure No. 9-1 it was determined that the documented inspection results, asserting that the welds on cable tray supports in the lower cable spreading room were acceptable, were erroneous.
[/
h 2.
Contrary to the requirements of 10 CFR 50, Appendix B,
\\m-Criterion IX and Paragraph 5.2 of the Consumers Power Company (CPCo) Quality Assurance Program Procedure for Design and Construction, Procedure 9-1, CPCo failed to assure that Bechtel Welding Procedure Specification No. PI-A-LH Structural specified the welding voltage requirements.
3.
Contrary to the requirements of 10 CFR 50, Appendix B, Criterion VII and Paragraph 5.3 of the CPC EPPQASD, Procedure No. 7, CPCo failed to assure that the docu-mentary evidence on purchased material was sufficient to identify that the purchased material met the specifi-cation requirements.
8006120
-