Appendix A

)

~

NOTICE OF VIOLATION Consumers Power Company Docket No. 50-329 Docket No. 50-330

~ Based on the results of the NRC inspection conducted on May 17-19, 1978, it appears that certain of your activities were not conducted in full compliance with NRC requirements as noted below. These items are infractions.

1.

Contrary to 10 CFR 50, Appendix B, Criterion V, and the Bechtel j

welding standard WFMC-1 titled " Welding Filler Material Control Procedure Paragraph 6.9 which states that, " Individual welders 1

1 shall keep their work areas clear of unauthorized or discqrded j

weld filler materials and electrode stubs and damaged electrodes 1

shall be placed in stub buckets", six damaged coated electrodes and one stainless bare electrode were found at the 598 foot level in the Unit 2 Containment Building.

2.

Contrary to 10 CFR 50, Appendix B, Criterion V, and the Bechtel technical specification for field fabrication of piping, pro-x_,/

cedure No. 7220-M-204(Q), two separate spool pieces were identified that were not being protected in the manner specified. This item of noncompliance requires no response since corrective action was completed prior to completion of the inspection.

l 1

1 1

O 9

m 4

(w]

-b 8006120

- -