ML19329D031
ML19329D031 | |
Person / Time | |
---|---|
Site: | Davis Besse, Perry |
Issue date: | 11/08/1975 |
From: | Hart R CLEVELAND, OH |
To: | Jason White SQUIRE, SANDERS & DEMPSEY |
References | |
NUDOCS 8002240040 | |
Download: ML19329D031 (2) | |
Similar Documents at Davis Besse, Perry | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217P2061999-10-26026 October 1999
[Table view]Forwards for First Energy Nuclear Operating Co Insp Rept 50-346/99-17 on 990928-1001.Insp Was Exam of Activities Conducted Under License Re Implementation of Physical Security Program.No Violations Identified ML20217N3851999-10-20020 October 1999 Forwards RAI Re Licensee 990521 Request for License Amend to Allow Irradiated Fuel to Be Stored in Cask Pit at Davis-Besse,Unit 1.Response Requested within 60 Days from Receipt of Ltr ML20217N2321999-10-15015 October 1999 Requests NRC Approval to Use Alternative to Requirements of 10CFR50.55a(f)(4)(ii).Licensee Requests Extension to Specified Schedule for Implementing Updates to IST Program ML20217F3901999-10-14014 October 1999 Discusses Request That Proprietary Document NEDE-32907P,DRF A22-0084-53, Safety Analysis Rept for Perry NPP 5% Power Uprate, Class III Dtd Sept 1999 Be Withheld.Determined Document Proprietary & Will Be Withheld ML20217G9201999-10-14014 October 1999 Discusses Utils Request for Approval of Quality Assurance Program Changes PY-CEI-NRR-2438, Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl1999-10-14014 October 1999 Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl PY-CEI-NRR-2435, Responds to NRC Re Violations Noted in Insp Rept 50-440/99-13.Corrective Actions:Ts SRs with Incorrect Descriptions Were Annotated to Ensure That CR Operators Are Aware That ACs Are Effect1999-10-13013 October 1999 Responds to NRC Re Violations Noted in Insp Rept 50-440/99-13.Corrective Actions:Ts SRs with Incorrect Descriptions Were Annotated to Ensure That CR Operators Are Aware That ACs Are Effect ML20217F8371999-10-0808 October 1999 Forwards Insp Rept 50-346/99-10 on 990802-0913.One Violation Occurred Being Treated as NCV ML20212L0691999-09-30030 September 1999 Forwards,For Review & Comment,Copy of Preliminary ASP Analysis of Operational Condition Discovered at Unit 1 on 981014,as Reported in LER 346/98-011 ML20217E7111999-09-30030 September 1999 Documents Telcon Conducted on 990929 Between M Underwood of Oh EPA & D Tizzan of Pnpp,Re Request to Operate Pnpp Sws,As Is,Until Resolution Can Be Obtained ML20217A5641999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Davis-Besse on 990901.Informs That NRC Plans to Conduct Addl Insps to Address Questions Raised by Issues Re Operator Errors & Failure to Commit to JOG Topical Rept on MOV Verification ML20212J1451999-09-30030 September 1999 Forwards Order,In Response to 990505 Application PY-CEI/NRR- 2394L.Order Approves Conforming License Amend Which Will Be Issued & Made Effective When Transfer Completed ML20212K9271999-09-30030 September 1999 Refers to 990927 Meeting Conducted at Perry Nuclear Power Plant to Discuss Initiatives in Risk Area & to Establish Dialog Between SRAs & PSA Staff ML20216J6701999-09-24024 September 1999 Forwards Post Examination Documentation for Written Operator Initial License Examination Administered at Davis-Besse Nuclear Power Station on 990920.Without Encls ML20212G4161999-09-24024 September 1999 Informs of Completion of Licensing Action for Generic Ltr 98-01, Y2K Readiness of Computer Systems at Nuclear Power Plants, for Perry Nuclear Power Plant ML20212G5811999-09-23023 September 1999 Informs That Licenses for Ta Lentz,License SOP-31449,PJ Arthur,License SOP-30921-1 & Dp Mott,License SOP-31500 Are Considered to Have Expired,Iaw 10CFR50.74(a),10CFR55.5 & 10CFR55.55 ML20212D3501999-09-21021 September 1999 Forward Copy of Final Accident Sequence Precursor Analysis of Operational Event at Plant,Unit 1 on 980624,reported in LER 346/98-006 PY-CEI-NRR-2432, Forwards NRC Form 536, Operator Licensing Exam Data, in Response to Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams1999-09-21021 September 1999 Forwards NRC Form 536, Operator Licensing Exam Data, in Response to Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams PY-CEI-NRR-2428, Submits Resolution to Seventh Question Proposed within NRC 980615 RAI Relating to Cooling Water Sys That Serve Containment Air Coolers & Assessment,Post Accident,Of Potential Water Hammer & two-phase Flow Conditions1999-09-16016 September 1999 Submits Resolution to Seventh Question Proposed within NRC 980615 RAI Relating to Cooling Water Sys That Serve Containment Air Coolers & Assessment,Post Accident,Of Potential Water Hammer & two-phase Flow Conditions ML20212D0151999-09-14014 September 1999 Requests Cancellation of NPDES Permit 3II00036.Permit Has Been Incorporated in Permit 3IB00016*ED.Discharge Point Sources & Associated Fees Currently Covered Under Permit 3IB00016*ED ML20212A8371999-09-13013 September 1999 Forwards Insp Rept 50-440/99-13 on 990712-30 & Notice of Violation.Insp Included Evaluation of Engineering Support, Design Change & Modification Activities,Internal Assessment Activities & Corrective Actions 05000346/LER-1998-001, Forwards Rev 1 for LER 1998-001,which Updates Corrective Actions & Revises Completion Date Re Implementation of Changes to Plant Emergency Operating Procedure.List of Commitments Attached1999-09-0909 September 1999 Forwards Rev 1 for LER 1998-001,which Updates Corrective Actions & Revises Completion Date Re Implementation of Changes to Plant Emergency Operating Procedure.List of Commitments Attached ML20217A8971999-09-0909 September 1999 Forwards Insp Rept 50-440/99-09 on 990709-0825.One Violation of NRC Requirements Occurred & Being Treated as NCV, Consistent with App C of Enforcement Policy PY-CEI-NRR-2431, Forwards Revised Emergency Plan for Perry NPP, IAW 10CFR50.54(q).Changes Constitute Revs,Temporary Changes or Reissued Pages1999-09-0909 September 1999 Forwards Revised Emergency Plan for Perry NPP, IAW 10CFR50.54(q).Changes Constitute Revs,Temporary Changes or Reissued Pages ML20211P3001999-09-0707 September 1999 Forwards FEMA Transmitting FEMA Evaluation Rept for 990504 Emergency Preparedness Exercise at Davis-Besse Nuclear Power Plant.No Deficiencies Identified.One Area Requiring C/A & Two Planning Issues Identified ML20216E5961999-09-0707 September 1999 Forwards Application for Amend to License NPF-3,revising Tech Specs 3/4.3.2.1,safety Features Actuation Sys Instrumentation & Associated Bases 3/4.3.1 & 3/4.3.2,reactor Protection Sys & Safety Sys Instrumentation ML20211Q6911999-09-0606 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Perry Operator License Applicants During Wks of 010108 & 15.Validation of Exam Will Occur at Station During Wk of 001218 IR 05000440/19990011999-08-31031 August 1999 Requests That Page Number 4, P2 Status of EP Facilities, Equipment & Resources, of Insp Rept 50-440/99-01 Be Replaced with Encl Rev ML20211K0951999-08-30030 August 1999 Forwards Request for Addl Info Re Fire & Seismic Analyses of IPEEE for Davis-Besse Nuclear Power Station,Unit 1. Response Requested within 60 Days ML20211K6681999-08-30030 August 1999 Forwards Copies of Certified Personal Qualification Statement - Licensee (NRC Form 398) for Operator Candidates Listed Below.Without Encls ML20211K6611999-08-30030 August 1999 Forwards Copies of Operator License Renewal Applications for Individuals Listed.Operators Have Successfully Completed Appropriate Operator Requalification Training Program at Dbnps.Without Encls PY-CEI-NRR-2425, Forwards Copy of Oh EPA Approval for Use of Nalco 7348 & Nalco 7468 at Pnpp,Iaw License NPF-58,App B,Epp,Section 3.21999-08-26026 August 1999 Forwards Copy of Oh EPA Approval for Use of Nalco 7348 & Nalco 7468 at Pnpp,Iaw License NPF-58,App B,Epp,Section 3.2 ML20211H0201999-08-25025 August 1999 Forwards semi-annual FFD Rept for 990101-0630 for DBNPS, Unit 1,IAW 10CFR26.71(d) ML20211D1171999-08-20020 August 1999 Forwards Insp Rept 50-346/99-09 on 990623-0802.Violations Identified & Being Treated as Noncited Violations ML20211G3911999-08-20020 August 1999 Forwards Update to Estimated Info for Licensing Action Requests Through 010930,re Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates PY-CEI-NRR-2411, Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,Encl1999-08-19019 August 1999 Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,Encl ML20211B0161999-08-13013 August 1999 Forwards SE Accepting Evaluation of Second 10-year Interval Inservice Insp Program Request for Relief Numbers RR-A16, RR-A17 & RR-B9 for Plant,Unit 1 ML20211J9201999-08-13013 August 1999 Urges NRC to Find Funds for Stockpiling Radiation Pills for Residents Living Near Plant ML20210Q8421999-08-13013 August 1999 First Final Response to FOIA Request for Documents.Records Listed in App a Being Released in Entirety & Records Listed in App B Being Withheld in Part (Ref FOIA Exempt 5) ML20210T1061999-08-12012 August 1999 Forwards Preliminary NRC Forms 398 & 396 for Listed Candidates,Per Operator License Exam Scheduled for Week of 990913.Encl Withheld ML20210R7861999-08-12012 August 1999 Forwards Insp Rept 50-440/99-12 on 990712-16.No Violations Noted.New Emergency Preparedness Program Staff & Mgt Personnel Were Professional & Proactive ML20210S6071999-08-11011 August 1999 Provides Final Response to NRC RAI Re GL 98-01, Y2K Readiness of Computer Systems at Npps ML20210S3961999-08-11011 August 1999 Requests That Ten Listed Individuals Be Registered to Take 991006 BWR Gfes of Written Operating Licensing Exam.Two Listed Personnel Will Have Access to Exams Before Exams Are Administered ML20210Q7981999-08-10010 August 1999 Informs That Intention to Utilize Sulfuric Acid in Pnpp Circulating Water Sys to Lower Ph Is Anticipated to Be Completed in Nov ML20210Q5831999-08-10010 August 1999 Requests Permission to Chemically Treat CWS for Algae Due to Cooling Water Basin Becoming Infected with Algae of Various Types PY-CEI-NRR-2423, Provides Final Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Npps. Remediation of Meteorological Monitoring Sys Has Been Completed & Ppnp Facility Is Now Y2K Ready1999-08-10010 August 1999 Provides Final Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Npps. Remediation of Meteorological Monitoring Sys Has Been Completed & Ppnp Facility Is Now Y2K Ready PY-CEI-NRR-2422, Forwards Addl Info Re ASME Section IX Relief Request (IR-023) for Inservice Examination Program at Pnpp,Submitted on 9808261999-08-10010 August 1999 Forwards Addl Info Re ASME Section IX Relief Request (IR-023) for Inservice Examination Program at Pnpp,Submitted on 980826 PY-CEI-NRR-2421, Forwards Semiannual fitness-for-duty Rept,Iaw 10CFR26.71(d) for Pnpp Covering Period of 990101-9906301999-08-10010 August 1999 Forwards Semiannual fitness-for-duty Rept,Iaw 10CFR26.71(d) for Pnpp Covering Period of 990101-990630 ML20210P8051999-08-0909 August 1999 Forwards Insp Rept 50-346/99-15 on 990712-16.No Violations Noted.However,Several Deficiencies Were Identified with Implementation of Remp,Which Collectively Indicated Need for Improved Oversight of Program IR 05000346/19980211999-08-0606 August 1999 Refers to NRC Insp Rept 50-346/98-21 Conducted on 980901- 990513 & Forwards Nov.Two Violations Identified Involving Failure to Maintain Design of Valve & Inadequate C/A for Degraded Condition Cited in Encl NOV 1999-09-09 Category:EXTERNAL CORRESPONDENCE MONTHYEARML20217E7111999-09-30030 September 1999
[Table view]Documents Telcon Conducted on 990929 Between M Underwood of Oh EPA & D Tizzan of Pnpp,Re Request to Operate Pnpp Sws,As Is,Until Resolution Can Be Obtained ML20210Q5831999-08-10010 August 1999 Requests Permission to Chemically Treat CWS for Algae Due to Cooling Water Basin Becoming Infected with Algae of Various Types ML20210Q7981999-08-10010 August 1999 Informs That Intention to Utilize Sulfuric Acid in Pnpp Circulating Water Sys to Lower Ph Is Anticipated to Be Completed in Nov ML20206E4561999-04-29029 April 1999 Informs That as Result of Achieving Sqg Status,Pnpp Oil/ Chemical Release Contingency Plan Will Not Be Routinely Forwarded to Perry Township Fire Dept Ofc ML20206E4631999-04-29029 April 1999 Informs That as Result of Achieving Sqg Status,Pnpp Oil/ Chemical Release Contingency Plan Will Not Be Routinely Forwarded to Oh EPA Ofc ML20206E4711999-04-29029 April 1999 Informs That as Result of Achieving Sqg Status,Pnpp Oil/ Chemical Release Contingency Plan Will Not Be Routinely Forwarded to Lake County Local Emergency Planning Committee ML20206E4741999-04-29029 April 1999 Informs That as Result of Achieving Sqg Status,Pnpp Oil/ Chemical Release Contingency Plan Will Not Be Routinely Forwarded to Lake County Sherriffs Dept ML20206E4821999-04-29029 April 1999 Informs That as Result of Achieving Sqg Status,Pnpp Oil/ Chemical Release Contingency Plan Will Not Be Routinely Forwarded to Lake Hospital Sys ML20207L4571999-03-11011 March 1999 Forwards Quarterly Self-Monitoring Repts, for Pnpp Sanitary Waste Sys for Dec,Jan & Feb.Results from Isotopic Analysis,Encl.Rept Is Final Quarterly Rept from Pnpp. Quarterly Isotopic Analysis Will Be Completed & Sent ML18016B1221999-03-0303 March 1999 Informs That Pnpp Has Been Permitted to Use Ferroquest LP7202 as Cw Treatment Additive in Plant CWS to Control Scale ML20206S3541999-01-20020 January 1999 Requests That Pnpp Be Removed from Significant Industrial User List for Lake County & Existing Permit Number 1004911, Terminated ML20198C0791998-12-0909 December 1998 Forwards Quarterly self-monitoring Repts for Pnpp Sanitary Waste Sys for Months of Sept,Oct & Nov 1998.High Oil & Grease Content Discovered in Sample Drawn on 981008, Resulting in One Violation During Quarter ML20151W1731998-09-0909 September 1998 Forwards Quarterly Self-Monitoring Repts, for Pnpp Sanitary Waste Sys for Months of June,July & Aug 1998.No Violations Occurred During Quarter.Results of Isotopic Analysis,Encl ML20249A0021998-06-11011 June 1998 Forwards NPDES Monthly Rept Forms for Month of May 1998.No Violations Occurred During Time Period ML20249A1871998-06-11011 June 1998 Forwards Quarterly Self-Monitoring Repts, for Pnpp Sanitary Waste Sys for Months of Mar,Apr & May of 1998.No Violations Occurred During This Quarter.Results of Isotopic Analysis,Encl ML20247J7791998-05-14014 May 1998 Forwards Revised State of Oh Water Withdrawal Facility Registration Annual Rept for Perry Nuclear Power Plant for 1997,correcting Intake Data Previously Submitted ML20247J7341998-05-13013 May 1998 Forwards SPDES Monthly Rept Forms for Month of Apr 1998.No Violations Occurred During Time Period ML20216D4931998-03-10010 March 1998 Requests NPDES Permit Mod Allowing Use of Sodium Hypochlorite or Sodium Bromide Utilized as Biocide in Cooling Tower/Circulating Water Sys.Approval Requested to Support Early Apr Start Date.Info Required Is Attached ML20203G9541998-02-25025 February 1998 Informs That Util Has Enlisted Nalco Chemical Co to Provide Replacement for Scale Inhibitor Product Currently in Use in Plant Circulating Water Sys.Dynacool 1385 Scale Inhibitor/ Dispersant Will Replace Betz Product.Required Info,Encl ML20203D1481998-02-19019 February 1998 Forwards Superfund Amends & Reauthorization Act (Sara), Section 312 Rept for Perry Nuclear Power Plant.Rept Lists Hazardous Substances Stored or Used in Excess of Ten Thousand Pounds ML20203H4771997-12-11011 December 1997 Forwards NPDES Monthly Rept Forms for Nov 1997.No Violations Occurred During Time Period ML20203H3021997-12-10010 December 1997 Forwards Quarterly self-monitoring Repts for Perry Nuclear Power Plant Sanitary Waste Sys for Months of Sept,Oct & Nov 1997.No Violations Occurred During This Quarter ML20211P9701997-10-10010 October 1997 Forwards Monthly Rept Forms for Month of Sept 1997.All Required Sample Collected in Accordance W/Npdes Permit Program.Table 1 Re Circulating Water Sys - Monitoring Results Included in Ltr ML20211H5711997-10-0101 October 1997 Informs That Util Will Arrange for Sampling at Least One Wk After Last Addition to Lagoon & Will Transmit Copy of Results to Ofc ML20211B2151997-09-16016 September 1997 Provides Written Confirmation of Prior Notification IAW Part III.12 of NPDES Permit 3IB00016 ML20210U7871997-09-12012 September 1997 Forwards Quarterly self-monitoring Repts for Perry Nuclear Power Plant Sanitary Waste Sys for Months of June,Jul & Aug ML20216J3201997-09-10010 September 1997 Confirms 970903 Telcon,Providing Info Re Drainage of Perry Nuclear Power Plant Circulating Water Sys ML20210J8241997-08-13013 August 1997 Informs That Plant Enlisted Betz Industrial to Perform Molluscicide Treatment on Svc Water Sys,Utilizing Clam-Trol CT-2.Tentative Schedule for Treatment Wk of 970825.Product Info & Required Environ Data Attached ML20210K2281997-08-13013 August 1997 Informs That Perry Nuclear Power Plant Scheduled Essential Maint of Svc Water Sys,Will Occur During Sept & Oct of 1997 ML20141H1331997-07-14014 July 1997 Informs That Maint Is Planned on Pnpp Circulating Water Sys During Refueling Outage Scheduled to Begin in Sept 1997. Product Info Encl for Betz Ferroquest LP7202,calcium Carbonate Scale Remover to Be Added During Maint ML20140C7791997-06-0606 June 1997 Forwards Quarterly self-monitoring Repts for Perry Nuclear Power Plant Sanitary Waste Sys for Months Mar,Apr & May ML20141E2261997-05-0606 May 1997 Forwards Annual Industrial Wastewater Questionnaire ML20136H9831997-03-13013 March 1997 Forwards Quarterly self-monitoring Repts for Perry Nuclear Power Plant Sanitary Waste Sys for Months of Dec,Jan & Feb ML20147E7121997-03-11011 March 1997 Responds to Certified Ltrs & 970106 Which Requested Info Sufficient to Answer Several Questions ML20135A7511997-02-21021 February 1997 Forwards,Iaw Section 312 of Superfund Amends & Reauthorization Act (Sara),Rept for Perry Nuclear Power Plant Indicating Hazardous Substances in Excess of Ten Thousand Pounds ML20134M0951997-02-14014 February 1997 Informs That Pnpp Has Changed from Large Quantity Generator to Small Quantity Generator Status Through Careful Waste Minimization & Chemical Control ML20134J5411997-02-0707 February 1997 Forwards State of Oh Water Withdrawal Facility Registration Annual Rept for Perry Nuclear Power Plant ML20133A9711996-12-19019 December 1996 Forwards Results of Water Supply Performance Evaluation Study 38 for Laboratory at DBNPS ML20132B9241996-12-0606 December 1996 Forwards Quarterly Self Monitoring Repts for Perry Nuclear Power Plant for Months of Sept,Oct & Nov 1996 ML20135E8841996-11-19019 November 1996 Forwards Comments Re Draft NPDES Permit 31B00016*ED & Antidegredation Rule Application ML20129A9591996-10-17017 October 1996 Requests Extension from 961020 to 961120 to Submit Comments Re Draft Permit Renewal for NPDES Permit No 31B000016*DD ML20117N5971996-09-13013 September 1996 Forwards Quarterly Self-Monitoring Repts for Perry NPP Sanitary Waste Sys for Months of June,Jul & Aug.No Violations Occurred ML20117K4561996-09-0303 September 1996 Provides Info Per 960730 Request,Stating in Oct & Nov Licensee Plans to Use Raw Lake Erie Water to Perform Hydrostatic Testing on Three Lengths of Newly Installed SW Piping ML20116M5511996-08-14014 August 1996 Forwards NPDES Monthly Rept Forms for Month of Jul 1996 & Rept Form for Feb 1996 ML20112G2901996-06-0505 June 1996 Forwards Quarterly self-monitoring Repts for Perry Nuclear Power Plant Sanitary Waste Sys for Months of Mar,Apr & May ML20117G6241996-05-17017 May 1996 Confirms 960514 Telcon Rept of Unauthorized Discharge Due to Leak in Expansion Joint in Plant Cooling Tower Basin Wall ML20108A3871996-04-23023 April 1996 Forwards Results of Water Supply Performance Evaluation Study 37 (Ws 037) for Lab at Davis-Besse Nuclear Power Station ML20101M9551996-04-0202 April 1996 Submits Ltr to Document No Significant Changes Occurred to Toxic Organics Mgt Plan.Analytical Rept Encl ML20101F3891996-03-20020 March 1996 Documents Info Discussed W/L Barton & M Underwood Re Porous Condition of Fiberglass Cooling Tower Overflow/Blowdown Line ML20101D0981996-03-15015 March 1996 Forwards Quarterly Self-Monitoring Repts for Perry Nuclear Power Plant Sanitary Waste Sys for Months of Dec,Jan & Feb, Isotopic Analysis Results & the Industrial Wastewater Questionnaire for 1995 1999-09-30 Category:EXTERNAL LETTERS ROUTED TO NRC MONTHYEARML20043F4571990-06-0808 June 1990
[Table view]Forwards NPDES Permit Renewal Application,Including Wastewater Discharge Info,Usgs Map Showing Location of Plant & Associated Outfalls & Line Drawing of Water Flow at Plant Site.W/One Oversize Map ML20005G1701990-01-10010 January 1990 Forwards Responses to 891212 Questionnaire Re Release of Sodium Hypochlorite (Spill 10-43-4117) from Plant on 891025. Caused by Improper Shutdown of Svc Water Chlorination Sys. On-the-job & Classroom Training Will Be Provided ML20245L4341989-08-17017 August 1989 Forwards Us EPA Accidental Release Prevention Questionnaire Initial Rept Re 890320 Ammonia Release at Plant ML20236W7251987-11-15015 November 1987 Expresses Concern Re Participation in Emergency Response to Radiological Accident at Plant.Bus Drivers Would Not Participate in Evacuation Until Concerns Have Been Addressed by Proper Authorities.Newspaper Clipping Encl ML20214G5301987-05-13013 May 1987 Forwards Certified Resolution 1987-31 Passed by Council of City of Mayfield Heights,Oh on 870511 Re Rate Increase Request by Cleveland Electric Illuminating Co to Puc of Oh. Served on 870520 ML20215B9711986-12-0606 December 1986 Forwards Wastewater Rept for Nov 1986. No Discharge Recorded at Outfall 602.North Basin Required Month of Nov for Refilling.Outfall 001 Wastewater Rept Will Be Provided in Dec 1986 Rept ML20214D2491986-11-11011 November 1986 Forwards Discharge Monitoring Rept for Oct 1986.Settling Basins Isolated from Station Discharge Following 860821 Incident.Sampling at Station Discharge Continued Until 860917 to Verify That No Pcb Discharged Into Lake Erie ML20213G8531986-11-10010 November 1986 Forwards Wastewater Rept for Oct 1986. Normal Operation of Waste Treatment Facility & Settling Basins Commenced on 861106 ML20206U7561986-09-30030 September 1986 Forwards Resolution Requesting Delay in Startup of Facility at 100% Capacity for Review Submittal Should Be Forwarded to Special Committee Investigating Safety of Facility.Served on 861007 ML20141E7291986-04-11011 April 1986 Forwards Wastewater Rept,Mar 1986 ML20137T4551986-01-27027 January 1986 Notifies That on 860130 & 31 Approx 815,000 Gallons of Water & Fluorescein Disodium Salt Solution Will Be Discharged to Settling Basin 2 to Locate Cracks &/Or Leaks at Weld Points. on 860207,dye Will Be Discharged Through Final Outfall 001 ML20141J9681986-01-14014 January 1986 Forwards Discharge Monitoring Rept for Dec 1985. Daily 2 H Discharge Limit for Free Available Chlorine Exceeded at Outfall 001 on 851207 ML20133L1751985-10-16016 October 1985 Forwards Wastewater Rept for Sept 1985.Electric Power to Sampling Station Lost Due to Damage in Structure Circuitry Panel.Power Restored & Sampling Reinstituted on 850930 ML20127J4051985-06-12012 June 1985 Forwards Ohio EPA Discharge Monitoring Rept for May 1985 & Corrected Form EPA-4500 Re Outfall 002 Area Runoff for Apr 1985.Apr Data Not Reported as 30-day Weighted Average as Required.Exceedence Notification for May Submitted 850505 ML20128A4011985-05-13013 May 1985 Forwards Discharge Monitoring Rept for Apr 1985. Exceedence Notification Re Total Suspended Solids for Outfall 002 in Apr Sent 850503 ML20099L2951985-03-18018 March 1985 Provides List of Available Matl Re Contention,Per 850314 Telcon.Most Matl Considered Irrelevant by Applicants. Discovery Viewed as Untimely.Svc List Encl.Related Correspondence ML20108B5581985-03-0101 March 1985 Updates Applicant 840208 & 0309 Responses to Ohio Citizens for Responsible Energy Interrogatory 10-2 Re Issue 16. Applicant Contract Agreement W/Swri Available at Facility. Svc List Encl.Related Correspondence ML20099H9401984-11-13013 November 1984 Forwards Corrected Page 3,Outfall 003 for Oct 1984 Wastewater Rept.Monthly Average,Max & Min Results for Total Nonfilterable Residue Inadvertently Omitted from Original Submittal ML20094A3311984-11-0101 November 1984 Updates Applicant 830308 Response to Interrogatory 9-38 of Ohio Citizens for Responsible Energy 830131 Ninth Set of Interrogatories Re Issue 15 (Steam Erosion).Svc List Encl.Related Correspondence ML20107K4891984-10-25025 October 1984 Forwards State of Oh EPA Permit to Install Source for Mod to Treatment of Water Plant Regeneration Wastewater,Per 841015 Application.Permit Fee Required within 15 Days of Effective Date of Permit ML20087D4321984-03-0909 March 1984 Updates Applicant 840208 Response to Ohio Citizens for Responsible Energy Interrogatory 10-2 Re Consultants Used on Issue 16 Concerning Reliability of Standby Diesel Generators.Related Correspondence ML20086T3241984-03-0101 March 1984 Forwards Affidavits to Accompany Applicant Supplemental Answers to Interrogatories on Issues 6,8 & 15.Certificate of Svc Encl.Related Correspondence ML20086T3551984-02-29029 February 1984 Forwards Supplemental Answers to Interrogatories on Issues 6,8 & 15.W/o Affidavits.Related Correspondence ML20082F7491983-11-22022 November 1983 Forwards MR Edelman to Bj Youngblood Re Issue 14 of Ohio Citizens for Responsible Energy Interrogatory 9-26. Ltr Updates .W/O Encl.Svc List Encl ML20078B5331983-09-23023 September 1983 Upgrades Applicant 830308 Responses to Interrogatories 9-38 & 9-43 Through 9-46 Re Steam Erosion.Addl Relevant Documents in Applicant Possession Listed.Arrangements Must Be Made for Copying.Svc List Encl ML20076B6221983-08-0909 August 1983 Informs That Missing Borg-Warner 12-inch Globe Valves S/N 57289 & S/N 57290 Located in Film Vault.Valves & Radiographs Acceptable,However,Weld Ends Exhibit Wrong Size Penetrameter ML20023C4021983-05-10010 May 1983 Objects to Characterization of Ohio Citizens for Responsible Energy Members as Persons Advocating Disruption, Demonstration & Disrespect for Law,As Stated in Sunflower Alliance 830506 Brief in Support of Motion ML20071B4091983-02-23023 February 1983 Forwards Amend to FSAR Filed W/Nrc Re Standby Liquid Control Sys.Amend Referenced in Util to NRC Included in Applicant 820820 Answer to Sunflower Alliance Second Set of Interrogatories.W/O Encl.Related Correspondence ML20028G6561983-02-14014 February 1983 Confirms 830214 Telcon & Provides Info Re Obtaining Interrogatories on Issues 13-15.Copy of Interrogatories Will Be Hand Delivered.Postal Svc Deserves Blame for Nondelivery. W/Svc List ML20070K1831982-12-27027 December 1982 Updates Applicant 820924 Response to Interrogatory 3-4 of Oh Citizens for Responsible Energy 820830 Third Set of Interrogatories.Svc List Encl.Related Correspondence ML20070H3461982-12-21021 December 1982 Suppls Applicant Response to Sunflower Alliance Interrogatory 2 Re Standby Liquid Control Sys Initiation.Svc List Encl.Related Correspondence ML20027D0541982-10-22022 October 1982 Responds to 821018 Ltr Re Svc of Documents to Parties. Telcons Could Expedite Matters in Future.Svc List Encl. Related Correspondence ML20065P2781982-10-18018 October 1982 Requests Attachment to NRC to GE Be Provided to Allow Progress on Issue 4.Document Needed Before Intervenor Can Decide If Updates to Interrogatories Necessary.Related Correspondence ML20027C5481982-10-14014 October 1982 Advises of Correction to Util Response to Interrogatory 6-8 of Oh Citizens for Responsible Energy Sixth Set of Interrogatories.Conclusion of Response Remains Unchanged. Related Correspondence ML20080K4221982-10-11011 October 1982 Informs of Review of All Equipment Packages to Evaluate Major Concerns Expressed by Task Force During & After Completion of Task Force Review.Corrective Action to Be Implemented Listed.Review Info Encl ML20063P7641982-10-0606 October 1982 Confirms 821005 Telcon Re Time for Filing Util Response to Oh Citizens for Responsible Energy Motion to Compel Answers to Sunflower Second Set of Interrogatories.Answer to Be Filed by 821012.Svc List Encl.Related Correspondence ML20069D8461982-09-20020 September 1982 Confirms 820920 Telcon in Which Sunflower Alliance Agreed That Applicants Could Have 5-day Extension in Answering Sunflower Alliance Second Motion to Compel.Related Correspondence ML20069D8561982-09-20020 September 1982 Confirms 820920 Conversation Re Effect on Intervenor Responses to Discovery of Redesignating Oh Citizens for Responsible Energy as Lead Intervenor on Issues 4 & 6.Svc List Encl.Related Correspondence ML20063J6231982-08-30030 August 1982 Confirms Agreement That Applicants Have Until 820916 to File Answer to Oh Citizens for Responsible Energy Motion for Leave to File Contentions 21-26 ML20058J0371982-08-0505 August 1982 Responds to Re Applicant Interpretation of Issue 1.ASLB Admitted Oh Citizens for Responsible Energy Potassium Iodide Contention.Applicants Have Not Changed Position on Subj Contention.Svc List Encl ML20058J4051982-08-0404 August 1982 Requests Prepared Documents Including Draft Emergency Plan & Std Operating Procedures as Interim Discovery Measure to Assist in Assessment of State Emergency Planning.Related Correspondence ML20058G5971982-07-29029 July 1982 Emphasizes That Issue 1 Includes Oh Citizens for Responsible Energy Potassium Iodide Issue.Related Correspondence ML20054J5951982-06-25025 June 1982 Forwards Ofc of Analysis & Evaluation of Operational Data 800801 Memo & Executive Summary to Assist in Answer to Oh Citizens for Responsible Energy 820429 Interrogatory 2-14 of Second Set of Interrogatories ML20053D1421982-06-0101 June 1982 Requests Confirmation That J Alexander Thesis Population Energetics of Freshwater Clam Musculium Lacustre Used in 811130 Response to 811015 Interrogatories Cannot Be Produced.Svc List Encl ML20053E0281982-06-0101 June 1982 Advises That Attachment Referred to in DG Eisenhut 780203 Ltr to GG Sherwood Was Forwarded 2 Months Ago.Response to Interrogatory 17 of Applicant Second Set Should Be So Supplemented ML20040H1661982-02-10010 February 1982 Requests Interrogatories & Production of Documents within 2-wk Period.Related Correspondence ML19346A3521981-06-11011 June 1981 Requests That Insp Repts in Support of Contention 9(1) Be Identified by Number & Date.Related Correspondence ML19257C5571980-01-22022 January 1980 Notification of 800219-21 Meeting W/State,Local & Federal Govt Representatives Re Emergency Planning.Submits Schedule ML19210C4371979-11-0808 November 1979 Forwards Lake Erie Area Research Technical Rept 130, Impingment & Entrainment,316(b) Demonstration. ML19329D3301978-12-29029 December 1978 Notifies of Intent of Toledo & Oh Edison'S Municipal Wholesale Customers to Obtain Access to Facilities 1990-06-08 |
Text
,
35 t:':'.df iar 34QW W' % 0 s
..).c ut" FM h* 910,A,, MIk
- - w.y .. s C-
,,,, gl,, s.CD CC 7.,.-.-
L J.\m St,do'..ekm^
O ,RA1.PH J. PERK. MAYOR oEP A,tTM Ef4T O fr LAW ^ 800 0s. 293 . CITY HALL J AMCS D. D AVIS S~~ ~N o v e m b e r 8 , 1975 -
ci.evti.,,.o os,o .....
oini.cron inies ....sooo
,x ,mm %
\'" // wa oent.um 3
Mr. Jack White Esq. Nov 141975 > 4 Chairman ,,,,,,m Squire, Sanders & Dempscy b 1800 Union Conmerce Building s q;[s.--
"'[
- o. 8 Cleveland, Ohio 44115 4 N o.
Dear Mr. White:
In our letter to Mr. John Lansdale of October 11, 1975, the' City of Cleveland mentioned the serious conflict of interest probica that is faced by ycur law firm, Squire, Sanders & Dempsey, in its representation of The Cleve-land Electric Illuminating Company (CEI) .in the Civil .
Action recently filed against CCI and others by the City of Cleveland in the Federal District Court for the Northern District of Ohio, Docket No. C-75-560.
I In order to forestall any further conflict of interest, as wcll as damag'e to your firm, the Bar, er The Cleve-land Electric Illuminating Company, by your seeking to represent CEI before the Nuclear Regulatory Cor. mission in pending causes URC Docket Nos. 50-346A, 50-500A,. )
50-501A, 50-440A and.50-441A, the City stated that should '
you represent CEI in those matters, the City vculd be forced to seek your removal as counsel for CEI. I You responded to the City's letter on October 27, 1975, by stat'ing that:
...we entered our appearance.in early February 1974 ... (W)e have been active-ly advising the company.... since that time ...and will not withdraw our ap-pearance."-
A careful check of both our records and,the records of the Nuclear Regulatory Commission fails to reveal any appearance by the firm of Squire, Sanders & Dempscy (including Mr. Lansdale) although Mr. Lansdale's name 9
v D
K e\
O]D a p JU .
1 24 UQO /27
a %
- A is on the Service List along with numerous others, for example Cleveland Councilman Francis Gaul, in early February. In short our search of the records does not indicate your firm has in fact entered an appearance.
Please bring to'our attention the basis upon which you .
claim that you are appearing on behalf of CEI and, there-fore, will not withdraw your appearance.
Your letter of October 27,-1975, gives the impression that the City knew or was aware cf your " appearance" before the Commission on behalf of CEI and the City wishes to stite firmly that it does not know and is not aware of your purportbd " appearance" in order to dispel any thoughts to the contrary.
The City reiterates that, while.it does not believe that you do in' fact' represent CEI bef~ ore the Nuclear Regula-tory Commission, should Squire, Sanders & Dempsey or its Washington affiliate, Cox, Langford & Brown, attempt to -
represent CEI before the Commission, the City of Cleve-land will be forced to file a motion before that Ccmmis-sion seeking your disqualification.
Very truly youts,
- ~~
Sf f Robert D. Hart -
First Assistant Director of Law RDH:ak T
e 4
e e
4 u;-
m D '9'T I (D L v
0 -
b
_ _ _ _ _ m.1_-_ - - - - - -