ML19329C960

From kanterella
Jump to navigation Jump to search
Forwards Addl Info Request Re LOCA Analysis & ECCS Design Revisions to Fsar.W/O Encl
ML19329C960
Person / Time
Site: Davis Besse 
Issue date: 12/05/1973
From: Stello V
US ATOMIC ENERGY COMMISSION (AEC)
To: Deyoung R
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8002200934
Download: ML19329C960 (2)


Text

%

e DocieMe 6ISTRIBUTION:

Docket File L: Reading File Branch Readino File 6EC 5 1973 L: Administrative Assistant

' locket 'lo. 50-346 o,

Richard C. DeYcung, Assistant Director for PWR's, L U

g T

%~@~Lk FSAR FIRST-ROL"10 RE'/IEW

.3 u

Plant Name:

Davis-Besse V

Licensing Stage:

CL Jocket No:

50-346 lessonsible Branca and Project 2ananer:

I. Peltier, PUR-4 Tec1nical Reviev Br?.nci Involved: Reacter 3ysters 3 ranch Oescriptien of Revie<:

Final Review Review Status: Not Cc alete Our me-rrandum of July 3,1973 identified several areas of tae Davis-lesse rsaa.<nich were incomolete to the extent t,at our first-Reuno Technical deviev Schedule was affected. Aronn thes2 areas was the absence ia t1e FSAR of LOCA analyses.

At that time,.de incicated tnat cor.712 tion of Firn-Mcund Questions must t9erefore be delayed until the applicant had sucmitted

he ruterial.

Amndrent 15, recer.tly suMitted on t,e Javis-Gesse dcchet, provides a nu:cer of FSAR Revisiens in the areas of LOCA analysis and ECCS desi.n..'.!e have 2xamined tais raterial and the attacned li':t orovides the required additional inferraticq vaien we are able to identify at tais ti.Te.

le 7 ave noted your letter to J. !!. Hendrie, dated 'Jctober 13, 1973, in which you indicated that ilthougn the Davis-Besse facility cemletion las slip?cd, it may se crucent to revie.1 i: mediately r aterial such as Amnd:mnt 16 tc avoid cackloccing tiesa i t cs. Hrvever, tha LOCA analysis is act comicte. The applicant nas providad an analyses of one large break in Amend:r,ent 16, in accordacc? vith oresant ECCS performnce critoria, sn.1 indicates that nther larce break analyses siil 5e pro-vided to tne revised AEC Acceptance Criteria at a later date. We accept tais position and we further note tnat certain portions of tne analyses oresented for Davis-3 esse are inconsistent wita r2ferenced SW topical reports or otS2r 3W SAR's.

Therefore, the LOCA analysis is an ooen iter on the docket whien must be civen First-Round review af.ter receipt of analyses in accordance with tne ney ECCS rule. Should the new ruldA5e published wit 5fn the near future, then a complete ECCS analysis usino the current Interim Acceptance Critaria vill be required. ' dita regard to srall pipe bronks, for the second time the toolic?nt has delayed submittal of these analyses. Again, we will not be able to comleta our First-;1ound Questicns without this caterial.

.t.;asa/h>'!

....L RS,3 T (

M.

[#

/

....L.:25

.:RS emcc >

m y

T.M. 4 ovak V.'stell.

r.umur, Q. Maze, !

jg,,,A m nn o

.12LdR3....ll.2/d/73 121.ja3

...12/.5[73 om >

r.

ac.m....m acx em

......_,,.m

Richard C. DeYoung Please rote tne Staff positiens now being taken for Davis-Besse on questions 3a, 3b, and C.

brig!nal daned by:

Victor Stallo, Jr., 'ssistr.r.t Of rector fcr 2ecctor Safety Directorate of Licensing cc w/c encl.

A. Giccusso, L M. G. :'cConald, L cc w/ encl.

S. H..Manauer, 3RTA J. M. !!andria, L V. Stallc, L T. 'hvak, L D

n[] T,DJ I. Feltier. ?n-4 U

U g' R. J. M ttson, L J. ;13zetts, L

~

OFFICE D SURNAME >

DATE >

Fose AEC Sis (Aew. 9-33) AECM 0240 see

.es--to-st ees-44s-e s

_. _