ML19329C816

From kanterella
Jump to navigation Jump to search
Order Scheduling Prehearing Conference 4 for 750423
ML19329C816
Person / Time
Site: Davis Besse, Perry  Cleveland Electric icon.png
Issue date: 03/20/1975
From: Rigler D
Atomic Safety and Licensing Board Panel
To:
NRC COMMISSION (OCM)
Shared Package
ML19329C814 List:
References
NUDOCS 8002200792
Download: ML19329C816 (2)


Text

.

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of

)

)

THE. TOLEDO EDISON COMPANY and

)

THE CLEVELAND ELECTRIC ILLUMINATING

)

COMPANY

)

Docket Nos. 50-346A (Davis-Besse N clear Power Station,

)

50-440A u

Unit 1)

)

50-441A

)

THE CLEVELAND ELECTRIC ILLUMINATING

)

COMPANY, ET AL.

)

(Perry Nuclear Power Plant,

)

Units 1 and 2)

)

PREHEARING CONFERENCE ORDER NO. 4 At the conclusion of prehearing conference No. 3 of January 31, 1975, the Board indicated that it would convene prehearing conference No. 4 on or about April 23, 1975 for the purpose of reviewing discovery progress and to consider such 7

other matters as,the parties might wish to call to the attention of the Board.

Prehearing conference No. 4 is hereby scheduled

^

i

'for April 21, 1975 commencing at 10:00 a.m. at the U. S. District Court House, courtroom 23 (third floor), Washington, D. C.

for the purpose of considering:

7 1)

Discovery progress to date and a schedule for the conclusion of discovery in these dockets.

The parties shall prepare a preliminary list of witnesses to be deposed.

2)

Applicant's Proposal for Erpediting the Antitrust Hearing Process, dated March 14, 1975.

Parties desiring to respond to Applicant's Proposal shall do so by April 7, 1975.

.=

8 o os 200 5?it;2

~

1 2-Any of the parties desiring tc place other matters on the agenda for prehearing. conference No. 4 should call them to the attention of the Board and the other parties no later than April 7, 1975.

IT IS SO ORDERED.

ATOMIC SAFETY AND LICENSING BOARD

_b -

Douglis

. Rigler, hairman Dated at Bethesda, Maryland, this7,0 th day of March 1975.

e o

O e

9 m

,,