Notifies of Review of FSAR Submittals to Date,Including Revision 4.Topical Rept Described in Encl Info Request Needed to Complete Review
ML19329C739
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/03/1974
From: Maccary R
US ATOMIC ENERGY COMMISSION (AEC)
To: Moore V
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8002190857
Download: ML19329C739 (2)


Text

--

^

s

~

w s

x SE? 3 1974 ibd-Docket No. 50-346 T Ib ] @ {} (U dub]

O[

O d i U b,,!4UL 4

Voss A. Moore, Assistar. t Director for Light Water Reactira, Group 2 Directorate of Licensing TOLEDO EDISON CO. DAVIS-BESSE NUCLEAR STATION UNIT 1 (CL) DOCKET No. 50-346 Plant Name: Davis-Besse Nuclear Station - Unit 1 Suppliers: Babcock & Wilcox; Bechtel Licensing Sta3e: OL Docket Number: 50-346 Project Branch and Manager: LWR 2-3; I. A. Peltier Requested Completion Date:

September 6, 1974 Task: Second Round of Questions (Q-2)

Review Status: Awaiting Response The inforastion submitted by the applicant in the FSAR, including Revision 4, has been reviewed by the Materials Engineering Branch, Licensing. We cannot complete our review until the topical report described in the enclosed information request is submitted to us for evaluation.

Ocid:al si;ned by IL It L ecary.

R. R. Maccary, Assistant Director for Engineering Directorate of Licensing

Enclosure:

Materials Engineering Branch 2nd Round Infor ation Request (Q-2) s cc w/ enc 1:

cc v/o encl:

S. H. Rnnauer, DRTA A. Gf ar:husso, L F. Schroeder, L W. G. Mcdonald, L S. Varga, L A. Schver.cer, L DISTRIBUTION:

/

I. A. Peltier, L Docket File (50-346)

S. S. Pavlicki, L L Reading File W. S. Hazelton, L MTEB Files R. M. Custafson, L l

M. B. Fairtile, L M

ffh-L:MTEB.(hM' L:MTEB[g/t

.L:MTEB N.'0II' L:MTEB MB'airtile:eb.WSHabbton_

RMGustbson_

S_.SPaw 1.gk..i.

.RIU11ccary _

... =. =.,

,. $_/.'[/.7p.~ f/13 /74

--f/t3 /74 9/,,3 / 7.4..

9/).L74 e/"

omvs >

Ferns AEc.318 (Rev. P 5)) AACWO240 Q u. e. oov a==as a=v e. =vi=4 orwieri ista.,as.ies 8002190 b [

N

i TOLEDO EDISON CD. DAVIS-BESSE NUCLEAR STATION UNIT 1 (OL)

DOCKET NO. 50-346 SECOND ROUND OF QUESTIONS (Q-2)

MATERIALS ENGINEERING BRANCH, L REACTOR COOLANT SYSTDi AND CONNECTED SYSTDiS l

Fracture Toughness Recuirements for the Reactor Coolant Pressure Boundarv The response to information request 5.2.6 regarding the method used by Babcock & Wilcox to conservatively estimate the reference temperature (RTNDT) f RCPB materials is incomplete. We cannot complete our evaluation until the applicant submits the topical report, BAW-10046, referenced in Section 5.2.3.6 of Revision 3 of the FSAR,.or otherwise provides the required information.