ML19329C734

From kanterella
Jump to navigation Jump to search
Forwards Second Round Requests for Addl Info Re Portions of FSAR for Which Auxiliary & Power Conversion Sys Branch Has Primary Responsibility.W/O Encl
ML19329C734
Person / Time
Site: Davis Besse 
Issue date: 09/12/1974
From: Tedesco R
US ATOMIC ENERGY COMMISSION (AEC)
To: Moore V
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8002190853
Download: ML19329C734 (2)


Text

,

i h/[ff/ / W I/C'Y '

D h

)60gE7 f//E h)

/

',% d..)

SEP 1 2 1974 L

D*

Q

~

h 6 jlj _ kl_ j( b a hacket No.

50- 346 Voss A. Moore, Assistant Director for Light Water Reactors, Group 2, L SICCND ROUND REQUESTS FOR ADDITIONAL INFORiiCICN, AUXILIARY AND P0k'E2 CCuVERSION SYSTihS 3 RANCH Plant Na:ne: Davis-Besse Nuclear Power Station, Toledo Edison, Unit 1 Licensing Sta:;e: OL Responsible 3 ranch: Lk'R 2-3 Project Manager:

Irving A. Peltier Eequested Ce.apletion Date: September 6, 1974 The enclosed second round requests for additional information covers these portions of the FSAR for which the Auxiliary and Power Conver-sloa Syste=a Branch has primary responsibilit*/.

Staff positions'are indicated by a single asterisk (*).

It is requested that after this information hcs been forwarded to Tolado E.dicon for actica that a meeting be established to discuss the enclosed requests in greater detail. We believe a meeting of this type will be of mutual benefit.

Robert L. Tedesco, Assistant Director for Cont

  • mant Safety Directorate of Licensing Enclosure :

As stated 8002190263 4

~

SEP 1 2 1974 Voss A. I' core ccI (w/o encl.)

A. Giar.busso N. !!cDonald (w/ encl.)

S. IIanauer F. Schroeder R. Klecker S. Var;;s D. Eisenhut J. Carter J. Glynn A. Scir.tencer

1. Poltier C. Long A..L tagaro Docket FiIe L:CS APCSB L Redding l

o n +c e

  • C : APCSB._....L:

B-.

[

- ~ ~ - -

~

..~..

nga.

.C.-Long -

-R.-Te

~L---

~ ' - -

9Lil174 -..9/ d&74 Slik24

~

.m ym ABC.318 (Rev. p.33) AarW 0240

% I4 as movenmusm? Panamme arrecan sete.ase.tes

_, _...