ML19329C644

From kanterella
Jump to navigation Jump to search
Forwards Updated Draft License Conditions.Discusses Addl Mods to Reserve Responsibility Language Per 741023 Suggestions
ML19329C644
Person / Time
Site: Davis Besse, Perry  
Issue date: 10/29/1974
From: Lessy R
US ATOMIC ENERGY COMMISSION (AEC)
To: Reynolds W
SHAW, PITTMAN, POTTS & TROWBRIDGE
References
NUDOCS 8002180157
Download: ML19329C644 (2)


Text

e a

v so CCT 2 9 S4 D

D L

Q dS g rp g

q

'q Wm. 3radford P.eynolds Esq.

l

[lt oJY'_;&r JUU UuL.a Shw, Pittmn, Potts & Trowbridge 91017th Street, N. W.

  • lashington, D. C.

2000C Re: The Toledo Edison Company and the Cleveland Electric Illuainating Company (Davis-3 esse Nuclear Pcwer Statica, Unit 1), The Clavoland Electric Illumintting Cononny, et al. (Perry Nuclear Power Plant, Units 1 and 2),

Docket.'ics. 50-N3A, 50-440A and 50-441 A

Dear r. Reynolds:

ittached clease finc draft licensa conditicas ("the draft") updated to incor,70 rate cartain ccanents and suggestions mde to data.

'iita refarence to tae suggestions contained in your letter of Octocar 23, 1374, pl aase nota belou addi tional modi fications to the Peserve Ressensi-bility" language (to be used in lieu of tna provision in the draft] incar-parating most af your suggestions witn raspect themto.

Resarve Resnonsibility Cannny and other entities shall antar into a reserve sharing arrangenent which shall establish tne minir.u, reserve requiremnt to ce installed and/or orovided under contrattual arrangements as necessary to maintain, in total, a reservo mrgin sufficient ta provide adequate reliability of sewer sucoly to the in.arcnnnected systens of the carties.

The parties shall also jointly estaalisn critoria for ap >ortion-ing such c.inimum reserves among themselves, which cri teria shall reflect tne relevant load and cacacity characteristics of the resnective parties, or unless agreenent is reached on the criteria for apportionnent of reservas, the minimum reserve requirement shall be calculated as a percentaga (to De identical for each party) of tne projected annual peak load, adjusted for purchases and sales of firm ocwer, l

including fpartial requirement firn power] any firm cower wnich may be nada available in partial fulfillaent of any entity's system requirements.

l orvoc s >

su aes a >

oavs *

]

Form AEC S t3 (Rev. 9 5D AEC.M 0240 oeo cas se e s 4es.: sao.aea 8002180 /f 7

/$7 i

r a

w Un, Bradford Raynolds, Esq. As regards "Rasarva Sharing," it is our view that the ini'.lal paragraph on page five (5) of the draft is preferele.

Sincarely, Roy ?. Lessy, Jr.

Counsel for AEC Te;ulatory Staff Eaclosure: As stated

.e DISTRIBUTION:

Docketing and Ser' ic ection (3)

REG Central File.

(Local Public Document Rm)

ASLAB ASLSP AScaitman (2)

JRutberg (3)

OGC Reading File OGC Gmtn File OGC A/T Formal Files (2) i l

4 4

l

....gf 4GC:

. = >

2,essy/ fmr JRu.tBE [

.._.10/25L74_

_10/jr/74 om r. ac.n. ia.

,n acu ono

..-