ML19329C642
| ML19329C642 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 12/31/1974 |
| From: | Harold Denton US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Moore V US ATOMIC ENERGY COMMISSION (AEC) |
| References | |
| NUDOCS 8002180154 | |
| Download: ML19329C642 (2) | |
Text
-.
l
's
'E9" '
(
!, 3
+
Distribution:
y i
L: Docket File V L:RDG L:SAB L:AD/SS CEC 3..S74 1 i i
I 2.
.ccrs., nasistan: Directcr for Li.;nt '.'anar Jeacters, n.
Group 2, L
'E'lISE D nY DROL.)CIC ElGI.12E RI:sG POS ITIO.1 4
PL.ui :;dC ;
Oavis-Bessa dait 1 LIC.iSIM STAGE:
GL
- ]C
- ::T ::U::SE2-53-340 i:3F MSILLE J1A:icil.
LWR 2-3
.I APPLICA.iTS <ESPO.iSE DATE.iCCESS;t.RY FOR j
- iEXT.^.CTIli PL A:ifiEC M P s]JiCT -
' S :\\ P DESCRI?TIu'd 0F RESPD;iSE.
.aports as ;.aquired 4
i RD I E.i ST ATUS.
Sita Anal / sis 3rdnen (!!y d rol o gi Engineering Section) - Awaiting Inforuation Enclosed is a revision to our Hydrologic Encineering position num3er one o f.iovember 15, 1974.
Positions numoer 2, 3 and 4 will rurain uncnange1.
The suojact revision is a result of the 9ec amucr 19 tn me sting wi t.: the aralicant and s & sequent staff aeeting ta da t e rt:i n e the best cours2 of action to follow.
M@:17p3 h!
3.'t.Sents tiarold E.
Denton, 2ssistant Director for Site Safaty Directorata of Licensing j
Enclosure:
(As stated) cc:
w/o onclosure 0
0 oo i
A. Giambusso W. Mcdonald a a jl J. Panzarella o-cc-w/ enclosure o 1_ (Dj
_ j( "' a S. Hanauer C. Long 1
F. Senroeder R. Klecker SS Dranen Chiefs D. Eisenaut A.
Kenneke J. Carter L. Eagia S. Varga A. Mw uc r
- a. S aiuj m
.._ 4gSS L:AD L. Saao E.
la,_wk._in.s
.. t--
L:,SAB
......q_._..
L.G.Hulman g ;'
. o, L.G.. HMn WPGpreill H RDt;[t on y
. j.--.
...p_._...
32L30/14_
12L I {. /.74 __12/3/./7412/g/74 Forva AEC 318 48e. 9-13) AICM 0240 sao cas is a *.* s. s s e e.s e.
8 0 02180 /N
~
o i
REVISED HYDROLOGIC ENGINEERING POSITION DAVIS BESSE NUCLEAR POWER PLANT, UNIT I DOCKET NO. 50-346 i
1.
You are requested to install a recording static water level gage on Lake Erie at the Davis Besse site for I
the purpose of confirming the assumed 80 percent re-duction in wind generated Lake Erie surge between Toleo and the Davis Besse site.
You are also requested to submit a report on any future storms that produce l
abnormal lake levels at the site.
While we have no basis for presently believing your design basis flood level is not adequate, this information is considered necessary' for us to independently verify the conser-vatism of the estimate.
1 i
e i
-