ML19329C612
| ML19329C612 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 04/21/1975 |
| From: | Maccary R Office of Nuclear Reactor Regulation |
| To: | Moore V Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19329C613 | List: |
| References | |
| NUDOCS 8002180128 | |
| Download: ML19329C612 (1) | |
Text
__ -__-_
2 i'.
Distribution:
/
Docket File:/ 50-346 V ff.2 NRR-Rdg
~
SEB-Rdg Docket fio.
50-346 APH 2 L tei a V. A. Moore, Assistant Director for Light Water Reactors Group 2 Division of Reactor Licensing DMIS-BESSE NUCLEAR POWER STATION UNIT NO.1, SAFETY EVALUATIOil REPORT, FSAR REVIEW Plant Name: Davis-Besse Unit 1 Licensing Stage: OL Review Docket Numbers:
50-346 Responsible Branch and Project Manager: L'AR 2-3, L. Engle Requested Completion Date: N/A Applicant's Response Date Necessary for Completion of Next Action Planned on Project: Unknown Description of Response: Report Review Status: Complete The FSAR submitted by the applicant has been reviewed and evaluated by the Structural Engineering Branch, Division of Technical Review. Our sections of the safety evaluation are enclosed. This evaluation is based on information provided by the applicant in the application through Amendant No. 28 dated harch 7,1975.
R. R. Maccary, Assistant Director for Engineering Division of Technical Review
Enclosure:
Structural Evaluation for Davis-Besse Power Station No. I cc w/o encl:
cc w/ encl:
A. Giambusso S. Hanauer L. Engle W. Mcdonald F. Schrowfer K. Kapur W. Butler S. Chan L. Shao R. Lipinski jyprc l
/
TRSEB TR:SEB TR:SEB TR:SEB z2 R[D:E x7807
- - g, 4/*
- RLipin $
o
'e =
- ski da Schanit.
KKapur I _
LSha
-R cary ou....
4/is/75 4////75 4/w /75 1/y/75
/75 Perus AEC.3Ia (Rev. 913) AICM 0240
- u. e. novsma sur paawrime opetese veva.one.e se v
8002180/7 I U
- - -