ML19329C584
| ML19329C584 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 07/17/1972 |
| From: | Deyoung R US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Seiss C Advisory Committee on Reactor Safeguards |
| References | |
| NUDOCS 8002180104 | |
| Download: ML19329C584 (1) | |
Text
-
Docket No. 50-346 JtJ!. I 71972 O
D Dr. Chester P. Siess d
bd Chairman, Advisory Com:nittee O @s[ g<
~ }
b,a
~
on Reactor Safeguards
.a i 0 _ $
L U. S. Atomic Energy Cou::nission J
-J Washington, D. C.
20545
Dear Dr. Siess:
Sixteen copies of the following are transmitted for the inforntion of the Committee:
TOLEDO EDISON COMPANY (Davis-Besse Nuclear Power Station)
A copy of the Atomic Safety and Licensing Board's Initial Decision dated July 9,1972 in the matter of Toledo Idison Company's Davis-Eesse Nuclear Power Station, stating that construction of the facility should not be suspended pedding completion of the NEPA review.
Sincerely, 24 Richard C. DeYoung, istan Director for Pressurized Water Reactors Directorate of Licensing
Enclosures:
As stated DISTRIBLTION:
Docket PWR-4 Reading Wilson (2)
L.I.AD,/P)3s,,,,,,,,!.IIIMINK L:PER-4 L$3R-4 omer >
ECoulb
- j XKE0fMX IAPir ' e'r AS encer
, M sunnaier, ~77$/72" ""~
~
7 /,.{/ 72
~7/
/72
&I/.,
onit >
Wm ABC-318 (Ret,9-SI) g
- a, e n,ga,yy 8 002180 / DT C