ML19329C540
| ML19329C540 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 08/20/1969 |
| From: | Boyd R US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Schneider R INTERIOR, DEPT. OF, GEOLOGICAL SURVEY |
| References | |
| NUDOCS 8002140907 | |
| Download: ML19329C540 (1) | |
Text
-
Distribution:
Docket Fil Docket No. 50-346 AUG 'o () 563 RL Reading RPB-2 Reading R. S. Boyd P. Howe R. R. Powell Mr. Robert Schneider H. Steele (2)
Office of Radio 9 drology 7
Water Resources Division U. S. Geological Survey U. S. Department of the Interior Washington, D. C.
20242
Dear Mr. Schneider:
In accordance with the understandings which vere reflected in Secretary Udall's letter of ?. arch 20, 1964 to Chairman Seabor::,
I am fervarding Volumes 1, 2 and 3 of the Preliminary Safety Analysis 2eport filed by The Toledo Edison Comeany and The Clev-land Electric Illuminating Company with their applicction for authorization to construct and operate the Day 12-Zesse Seclear Power Station.
The proposed facility is to be' located on the applicants' appro ti-nately 900-acre site on the southwest shore of Lake Erie, about twenty-one niles east of Toledo, in Ottava County, Ohio.
Please review the enclosed volumes and lat us have 7our cements on the hydrological aspects of the cavis-Besse Station site tich
=ight have a bearing on our safety review of the Davis 'tesse Nuclear Power Station Unit No.1.
Tour prcept review and comments will be appreciated.
Sincerely yours, Od&21::;c33 3y Raer S. Scyd Roger S. 3oyd, Assistant Director for Reactor Projects
Enclosures:
Division of Reactor Licer. sing Vols. 1, 2 & 3 of PSAR, Davis-Bessa NPS cc: Mr. Dwight M. Lemmon omet >
.DRL dP.,.
.... I....DRL9 P J
-n
{ n?....
HSteele hs RLTedesc RS y'd
..@,!_.!.bk...
,8.!..
b9 _. 8)
).b 9..
DAtt >
Ports AEC StatRev.9 53) AECM 0240 e t eoveneese eeione onme s oee o-aee-eer 002140 % )
g