ML19329C394
| ML19329C394 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse, Perry |
| Issue date: | 03/20/1975 |
| From: | Rigler D Atomic Safety and Licensing Board Panel |
| To: | Atomic Safety and Licensing Board Panel |
| References | |
| NUDOCS 8002130762 | |
| Download: ML19329C394 (2) | |
Text
.
t
~
/4 #
3<t,N
'~
^7'.m a u.
w C} NAR2 01975 >
EE' Y
UNITED STATES OF AMERICA NUCLEAR REGULATORY. COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING EOARD
$,$
- r :: -
wg In the Matter of
)
)
THE TOLEDO EDISON COMPANY and
)
A #b5 THE CLEVELAND ELECTRIC ILLUMINATING
)
50-346A
)
Docket Nos.
COMPANY (Davis-Besse Nuclear Power Station,
)
50-440A Unit 1)
)
50-441A
)
THE CLEVELAND ELECTRIC ILLUMINATING
)
)
(Perry Nuclear Power Plant,
)
Units 1 and 2)
)
PREHM RING CONFERENCE ORDER NO. 4 At the conclusion of prehearing conference No. 3 cf January 31, 1975, tne Board indicated that it would convens 1975 for the prehearing conference No. 4 on or about April 23, pur ose of reviewing discovery progress and to consider such other matters as the parties might wish to call to the attention of the Board.
Prehearing conference No. 4 is hereby scheduled for April 21, 1975 com:::encing at 10:00 a.m. at the U. S.
District Cou.
Houco., courtrcom 23 (third floor), Washington, D. C.
for the pu:.cse of considering:
1)
Discovery progress to date and a schedule for the conclusion of discovery in these dockets.
The parties shall prepare a preli:Sinary list of witnesses to be deposed.
2)
Applicant's Proposal for E:cpediting the Antitrust Hearing Process, dated March 14, 1975.: Parties desiring to respond to Applicant's Proposal shall do so by April 7, 1975.
09b g
~
Og13
O
. 2 --
Any of the parties desiring to place'other matters on the agenda for prehearing conference No. 4 should call them to the attention of the Board and the other parties no later than April 7, 1975.
4 ATOMIC SAFETY AND LICENSING BOARD A,
DougLis
. Rigler, Chairman Dated at Bethesda, Maryland, this30th day of March 1975.
I e
4 4
e I
-