Discusses Reactor Status & Assigning of Licensing Fee Since 770407.Reactor Status Should Be Closely Monitored & Partial Refund of Fee Should Be Considered If Power Operation Is Delayed
ML19329C355
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/23/1977
From: Holloway C
NRC OFFICE OF ADMINISTRATION (ADM)
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
NUDOCS 8002130720
Download: ML19329C355 (2)


Text

- ---.__ - - _ _ - _ _ _______

.s2m-e....

s C

% '?.

fo-3off, s

')

y

.s n

O.

c

+

m

~

INil 2 3 D l

1 Files OPERATING LICIESE 7EE - DAVIS BISSE 1 On April 7,1977, Buclear Reseter Regulation (NRR) informed the License Fee Management Branch (LPMB) that they plassed to inaue an operating license approv4== rely April 15, 1977 for fuel loading only (0% power level) to Toledo Edison Coupesy (TEC) for the subject unit. TEC was billed $250,000 for the fuel loading license on April 13,1977 (Insoice 167-77). Subsequent u si y " m from NRR dated April 15, 1977 to LFMB stated that EER expected to issue a full power operating license t!!> TEC around April 18, 1977 and that LFMB should take the appropriate eteps to colleet the higher operating licensa fee. Da April 19, 1977, Invoice 167-77 was amended to provide for operation at 100% power and TEC paid the full fee of $762,820 on the same day.

~

Da April 22, 1977. ERR 4===ad Operating License No. NPF-3 for the subject unit. The license, however, was conditioned to provide a sequential approach to power operation. The sequence to power operation would begin with Operational Mode 6 (initial fuel loading) and proceed in succession to Operational Mode 1 (power operation); however, certain items would have to be completed by the utility and would require the written approval of the Co-imaios prior to proceeding from one operational mode to another. Essentially them, License NPF-3, as issued on April 22, 1977, was a "0" power licanos since TEC ewuld not proceed to power opera-tion withmet written sotheriaation of the Commission.

I spoka to Mr. Leos Eagle, Project Mmeager, Light Water Rasctors Branch Bo. 1, NRR,se Jane 19, 1977 concerning the current status of the reactor.'.'

and the matter of a partial refund s4=ea the licensee was not authorized to operate at full power. He informed me that Davis Besse 1 is currently authorised to peseeed to Operational Mode 5 (ecid shutdown) (See letter Roger Boyd TEC deced May 10, 1977 amm1ased.?. I inquired as to trhes the lie===== wesid seash Mode 1 ~ (poser operation) and he indicated that the 14=====

com&d pensib1T reach Mode 4 (bot. shutdwe) by Jues 24, 1977, pesemed to Mode 3 (het standby) by July 3 and reach Mode 2 (initial criti-enlity) and Mode 1 (power ;6 h_) by July 13. - 1, also, inquired as to whether the liseases could poseend to. full (1002) power operation spea

- reaeking Mode 1 er whether ths.1te==== would be forther esaditioned to parudt poser aseenston in wetous stages, 'e.g.,

201, 80%.. Mr. Eagle u t=deh 'thett$t ses his==ames*==a4=g' thee open r=aahier Mode 1 the m===as emeld penseed toq300K poser, - = without further approval from the GesetomSon. Qt@sW2g EQ W 'C.,,

MC W

N 9 k7i &,ce.;g,r.f %.:Jg w) m.'w. ^v

+

2 'O s:

.-r s

'k i YY>

y.M. a [ *,

~ '

~

~

. h 7 /4.2 77%e

mu we

,__ _ a r.

e,, m m_

8 0 0213 0 7N

l

. n.r v. g..

.nn-e e

2.,-._,.

.7w

~...- -. -

-n j

3, y

+

'T e

O

.+,

- On June 21, 1977 I spoke to Mr. Lowell Rowe, Vice President, Facilities Developeset, Toledo Edison Company (419-259-5435 site), ec a erning the status of the resetor and the matter of a partial refund, since TEC is not authorised to operate at full power. He informed me that it_is,their,,

i intent to proceed to power operation as quickly as possible and the7_ hope __

l to reach criticality by Ju4y 7, 1977.

Mr. Eowe stated that we should not proceed with a partial refund unless we hear from him.

Based on my conversation with Mr. Howe, LFMS should not, proceed at thie time to initiate a refund. We should, however, closely monitor the situation and if the power operation is delayed, a partial refund of the operating license fee should,be further considered.

pe*> p C. James Rolloway, Jr., Asst. Chiaf License Fee Management Branch Office of Administration Nginal SisC'dDI-Approved:

William O. Miller, Chief License Fee Management Branch Office of Administration i

ce John Stols, DFMILWR#2 Leon ngle, DFM LW172 Etoy Hylton, DFM:LVRf2 James Lincoln, CON Distribution:

Docket File 50-346 Reactor File Reading (2)

EScoupe (2)

CJHolloway 5

+

6 4

LFMB:ADM LFMB:ADM o,rter >

ler witolloway:I fr "l \\

summanc h. Q) nave >

7 I'

Y Y u..sw.w _.w e n d-a.re a L ud;

_.