INil 2 3 D l
1 Files OPERATING LICIESE 7EE - DAVIS BISSE 1 On April 7,1977, Buclear Reseter Regulation (NRR) informed the License Fee Management Branch (LPMB) that they plassed to inaue an operating license approv4== rely April 15, 1977 for fuel loading only (0% power level) to Toledo Edison Coupesy (TEC) for the subject unit. TEC was billed $250,000 for the fuel loading license on April 13,1977 (Insoice 167-77). Subsequent u si y " m from NRR dated April 15, 1977 to LFMB stated that EER expected to issue a full power operating license t!!> TEC around April 18, 1977 and that LFMB should take the appropriate eteps to colleet the higher operating licensa fee. Da April 19, 1977, Invoice 167-77 was amended to provide for operation at 100% power and TEC paid the full fee of $762,820 on the same day.
~
Da April 22, 1977. ERR 4===ad Operating License No. NPF-3 for the subject unit. The license, however, was conditioned to provide a sequential approach to power operation. The sequence to power operation would begin with Operational Mode 6 (initial fuel loading) and proceed in succession to Operational Mode 1 (power operation); however, certain items would have to be completed by the utility and would require the written approval of the Co-imaios prior to proceeding from one operational mode to another. Essentially them, License NPF-3, as issued on April 22, 1977, was a "0" power licanos since TEC ewuld not proceed to power opera-tion withmet written sotheriaation of the Commission.
I spoka to Mr. Leos Eagle, Project Mmeager, Light Water Rasctors Branch Bo. 1, NRR,se Jane 19, 1977 concerning the current status of the reactor.'.'
and the matter of a partial refund s4=ea the licensee was not authorized to operate at full power. He informed me that Davis Besse 1 is currently authorised to peseeed to Operational Mode 5 (ecid shutdown) (See letter Roger Boyd TEC deced May 10, 1977 amm1ased.?. I inquired as to trhes the lie===== wesid seash Mode 1 ~ (poser operation) and he indicated that the 14=====
com&d pensib1T reach Mode 4 (bot. shutdwe) by Jues 24, 1977, pesemed to Mode 3 (het standby) by July 3 and reach Mode 2 (initial criti-enlity) and Mode 1 (power ;6 h_) by July 13. - 1, also, inquired as to whether the liseases could poseend to. full (1002) power operation spea
- reaeking Mode 1 er whether ths.1te==== would be forther esaditioned to parudt poser aseenston in wetous stages, 'e.g.,
201, 80%.. Mr. Eagle u t=deh 'thett$t ses his==ames*==a4=g' thee open r=aahier Mode 1 the m===as emeld penseed toq300K poser, - = without further approval from the GesetomSon. Qt@sW2g EQ W 'C.,,
MC W
N 9 k7i &,ce.;g,r.f %.:Jg w) m.'w. ^v
+
- 2 'O s:
.-r s
'k i YY>
y.M. a [ *,
~ '
~
~
. h 7 /4.2 77%e
mu we
- ,__ _ a r.
e,, m m_
8 0 0213 0 7N
l
. n.r v. g..
.nn-e e
2.,-._,.
.7w
~...- -. -
-n j
3, y
+
'T e
O
.+,
- On June 21, 1977 I spoke to Mr. Lowell Rowe, Vice President, Facilities Developeset, Toledo Edison Company (419-259-5435 site), ec a erning the status of the resetor and the matter of a partial refund, since TEC is not authorised to operate at full power. He informed me that it_is,their,,
i intent to proceed to power operation as quickly as possible and the7_ hope __
l to reach criticality by Ju4y 7, 1977.
Mr. Eowe stated that we should not proceed with a partial refund unless we hear from him.
Based on my conversation with Mr. Howe, LFMS should not, proceed at thie time to initiate a refund. We should, however, closely monitor the situation and if the power operation is delayed, a partial refund of the operating license fee should,be further considered.
pe*> p C. James Rolloway, Jr., Asst. Chiaf License Fee Management Branch Office of Administration Nginal SisC'dDI-Approved:
William O. Miller, Chief License Fee Management Branch Office of Administration i
ce John Stols, DFMILWR#2 Leon ngle, DFM LW172 Etoy Hylton, DFM:LVRf2 James Lincoln, CON Distribution:
Docket File 50-346 Reactor File Reading (2)
EScoupe (2)
CJHolloway 5
+
6 4
LFMB:ADM LFMB:ADM o,rter >
ler witolloway:I fr "l \\
summanc h. Q) nave >
7 I'
Y Y u..sw.w _.w e n d-a.re a L ud;
_.