Forwards Public Announcement of Facility CP Issuance.Pwr Plant Will Have 872 Mwt Net Electrical Capacity.Estimated Const Cost Over 305 Million Dollars.Completion Planned for 1974.Public Hearings to Be Held Between 701208 & 710212
ML19329C327
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/14/1971
From: Harris J
US ATOMIC ENERGY COMMISSION (AEC)
To: Johnson, Ramey, Seaborg G
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8002130692
Download: ML19329C327 (2)


Text

..

s.".W..,-

6

, _ _. - -.. = *

  • f,.

[

_s

.d.

Y j

Ifarch 24, '971 l

i - A/v

./

/

jo 3 */b Chairnnn Cosborg Com..i ssioner F.ancy Connissionar Johnson Co.rt:issi oner I, arson Cottnissionar u r c a vil...,;J,A

,t..,1. ) a. e,c.

.._ D I s, s, o....,,,2:

a...,,....c, n.,. :.4 s

..s ic

a e

n;.

... eu.ss PLldiT I.', 0:!IU Eacloscd for your inforciation is a public ar.ouncer.cnt of issuaace of a rcrn.it to coledo raison Co.:.7:ny and C1cycland E.loctric Illuninnting 2n::any fe r ccus truction of the Davis -Ses s e ;;u:Icar Pc.rer 5ta tion

t. ar '.ic! ': art:or, O'..i o.

Tna anncuz.ccc. cat has tite approp.1 of the Director of ?>;ula-tion.

Ja plan to issue it scon af ter issuance of the pcInit whica is enpected s:tortly.

51gnea IoEn X. TTN John A.~ Harris, ~irector Division or ruclic Internation Enclosure g

g, cc:

ii. L. Prica, Director of 2egulation H. C. Brown, AGM R. D. O'Naill, OCR W. 3. McCool, SECY P. Morris, DRL, attn: B. Grimes T. Engelhardt, CGC J. D. Thre1keld, PAR S. T. Robirson, SECY cmcc,

- PI

.PI P I,,,.,,

PI l

sua.m c

..C.::.t.i l e.s.:.gmo..i.F.I n gr.a m JFogghfAr.d....JA.H;t.r. rig..,,

eare.. 3/ 2 4/.7.1....

... 3L....L7.1_

3 /..../.21.

..3L..../1.1...._

Tcrm AEC-518 sitev.9 53) AICM 0:40 c, s. cos:asunt Pic.n.c orricE ts a o. ws ssa 8002 1so 677 A

~

/

CONSTRUCTION PERMIT FOR NUCLEAR PONER PLANT IN OHIO ISSUED BY AEC A permit to build a nuclear power plant in Ottawa County near Oak Harbor, Ohio, has been issued to the Toledo Edison Company and the Cleveland Electric Illuminating Com-pany by the Atomic Energy Commission's Division of Reactor Licensing.

The Davis-Besse Nuclear Power Station will use a pres-surized water reactor and will have an initial cat electrical capacity of about 872,000 kilowatts.

The-facility will be located on a 900-acre site on the south shore of Lake Erie, about 6 miles northeast of Oak Harbor and about 21 miles east of Toledo.

Toledo Edison Company will be responsible for design, construction and operation of the plant.

Babcock 4 Wilcox Company will furnish the nuclear steam supply system and the General Electric Company, the turbine generator.

Bechtel Corporation and its affiliate Bechtel Company have been selected to provide architect-engineer and construction management services.

The cost to construct the facility, including associated transmission facilitics and the first nuclear fuel, is esti-mated to be $305,742,000.

Plans call for completion in 1974.

Issuance of the permit follows reviews by the AEC Regulatory Staff and the Commission's Advisory Committee on Reactor Safeguards and a public hearing conducted by an Atomic Safety and Licensing Board.

The board conducted the public hearing in Port Clinton, Ohio, intermittently between December 8,1970 and February 12, 1971 and issued a decision on March 23 authorizing issuance of the permit.

The board's decision is subject to appeal to the Atomic Safety 4 Licensing Appeal Board-by any party to the proceeding.

-,