Text
,e DISTRIBUTI0ft: d e e%4 K,gZg.,
i s
i
,4E Files h'.> ~
I R g.
/
July 3,1978 ADFC Chron GRKlingler a
t Gi'0PMOU:: FOR:
E. L. Jordan, Exccutive Officer for l
Operations Support, IE l
FR0'l:
J. H, Sniesek, A/D for.'ield Coordination Division of Reactor Operations Inspection, IE
SUBJECT:
AS !0ctAL CCCURREliCE REPORT TO C0 TIGRESS - SEC0!!D QUARTER CY 1978 Pursuant to your subicct recorandura dated June 23,1978, we have rvviewed the MPA request for inputs to the report.
Items 1 through 3 are addressed below:
1.
We have already identified events other than those listed wnich we believe should be censidarcd as possible abnomal occurrences. These events are " Diesel Generator Autoratic Loading Sequence Failure' at Devis-Casse Pc<:er Station, Unit 1, and " Crack In The Ten-Inch 7ecirculatTcn Line' at cuana Arnold.
2.
!! rite ups on those events were provided to X005 for transnittal to liPA Jur.e 15 and 25,1973 respectively.
If the tuo events listed are not designated as abnomal occurrences in this quarterly report, we suggest that they be ir.cluded as ever'ts dacted not to be AO's.
e concur with the list of ucts presented for inclusion as Appendix C or E.iclosure 3 entrees.
3.
Enclosed is close out infomation for LACBUR provided by RIII for close out of A0-77-3, " Fuel Rod Failures At t!uclear Power Reactor."
/3/
J. H. Sniesek, A/D for Field Coordination Division of Reactor Operations Inspection, IE
Enclosure:
Close cut for A0-77-3 1-i cc":: a c no:..t m 2 o r r i c c >
...:...............,..E9.. {.M 1!.E.....l..@,F,p;@,I,: g,,
,,,,,,,,,,,,,,,,, l,,,,,,,,,,,,,
t'w,
<*lt r - Q Sgie,ze3,,,,,
Ta CT:... G...L..(Mr g l er........p G R,K,1,i gg 1,e :
,,,3 suauschi
...............C!.2,{0,1,p,)............ J. 22.3. /l B....... j. 21... /.7R.......
one>
N r4 0 F O eW1 313 (G 7 7) t IJ. S, GOVE RNA1E NT f'RINTING C F FICE 1977-237-025
~
8002180 877 f
.e
--s E. L. Jordan July 3,1978 4
6 J
cc:- G. C. Gower r
N. C. Moseley 1
Oprice >
su aN4u e >...................
..........{'..................................-m DATED.........................................................
=
NAC FORM 318 (6 771 W U. S. GOVE RNMENT PRINTING OF F 3CE 1977-237-025
,6 77-3 Fuel F.ed Failures ac ?:uclear Pouer P.eseter As previoucly rcported, th2 licenece ecspleted full recovery procedures and testing ar.d sub=1tted new technical specifications designed to dctect fuel failures and to preclude g.ross fucl failurcs.
The NRC co=pleted the ctaluation and issued new technical specifications that li=it race of power cacalation and average fuci exposure. The licensee restarted the plant in accordance with the new technical specifications.-
Actions Tcken to Prevent Recurrence.
Licensoe - The licennee has implemented a more rigorous primary coolcat and of t-gas monitoring program to dercct any onset of fuel fo11ure.
Monitoring thasa indiencors and strict control of power cocalation raten should preclude gross failures.
N3C - The NRC is c1csely monitoring the licensee's program cnd evaluating the data.
The NRC's Office of Inspection and Caforcenant monitored the.
startup activitios and vili continue to moniter licenseo compliance uith the new technical specifications.
This item is closed for the purposes of this report.