ML19329C253
| ML19329C253 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 08/04/1976 |
| From: | Roe L TOLEDO EDISON CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML19329C254 | List: |
| References | |
| HO-1295-F3, NUDOCS 8002120969 | |
| Download: ML19329C253 (1) | |
Text
./ ~ j 3
F.
- p.
TOLEDO EDISON LOWELL E. ROE Vice President Faciht es Developent 14191 259-5242 August 4, 1976 Docket No. 5 -346 Control No. H0 1295 F3 Mr. James G. Keppler Regional Director, Region III Directorate of Regulately Operations U. S. Nuclear Regulatcry Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137
Dear Mr. Keppler:
This letter is submitted as a Final Report regarding the Davis-Besse Nuclear Power Station Unit No. 1 reactor vessel surveillance specimen capsule holder deficiency which was reported by my Interim Report letter of May 7, 1976.
The attached two page report entitled " Report on Surveillance Specimen Capsule Holder Tube" dated August 3, 1976 includes a description of the deficiency, an evaluation of the safety implications and the corrective action which has been taken.
Very truly yours, M
LER:ss Attachment cc:
Dr. E. J. Volgenau, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Cecmission Washington, D.C.
20555 8002120((f 8
l THE TOLEDO EDISON COMPANY ED! SON PLAZA 300 MADISON AVENUE TOLEDO. OHIO 43652
[
4
. -...