Forwards Final Deficiency Rept Re Reactor Vessel Surveillance Specimen Capsule Holder Per 760507 Interim Rept
ML19329C253
Person / Time
Site: Davis Besse 
Issue date: 08/04/1976
From: Roe L
TOLEDO EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19329C254 List:
References
HO-1295-F3, NUDOCS 8002120969
Download: ML19329C253 (1)


Text

./ ~ j 3

F.

  • p.

TOLEDO EDISON LOWELL E. ROE Vice President Faciht es Developent 14191 259-5242 August 4, 1976 Docket No. 5 -346 Control No. H0 1295 F3 Mr. James G. Keppler Regional Director, Region III Directorate of Regulately Operations U. S. Nuclear Regulatcry Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

This letter is submitted as a Final Report regarding the Davis-Besse Nuclear Power Station Unit No. 1 reactor vessel surveillance specimen capsule holder deficiency which was reported by my Interim Report letter of May 7, 1976.

The attached two page report entitled " Report on Surveillance Specimen Capsule Holder Tube" dated August 3, 1976 includes a description of the deficiency, an evaluation of the safety implications and the corrective action which has been taken.

Very truly yours, M

LER:ss Attachment cc:

Dr. E. J. Volgenau, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Cecmission Washington, D.C.