Discusses Resolution of Concerns Re Performance of Test Procedure 401.11 for Instrument Ground Installation at Facility.Concludes That Util Can Proceed to Mode 2 W/O Completing Test Procedure
ML19329C129
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/08/1977
From: Stolz J
Office of Nuclear Reactor Regulation
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NUDOCS 8002120862
Download: ML19329C129 (2)


Text

.-

Jistribution c

Jocket File 50-346* F,-

LUR 1 File J. Stolz L. Engle AUG 0 81977 E. Hylton MEMORANDUfl FOR:

K. Seyfrit, Assistant Director, Division of Reactor Operations Inspection FROM:

John F. Stolz, Chief, Light Water Reactors Branch No. 1 THRU:

D. B. Vassallo, Assistant Director for Light Wat g g g.j Reactors y yg

SUBJECT:

DAVIS-8 ESSE 1 - TEST PROCEDURE TP 401.11. INSTRUMENT GROUND GRID TEST This mecorandam will confim our telephone conversation with you on August 5,1977 regarding the resolution of concerns over the instrunent ground installation at Davis-Cesse 1.

Toledo Edison Company's letter to J. C. Kenpler, Region III dated August 3,1977 indicated that Test Procedure TP 401.11 cannot be completed as intended because the Sabcock & Wilcox Company ( El) and Bailey Peter Company equipment is not actually installed with an isolated instrunent ground system connected to the station ground systea at one point only in accordance with the orir,inal design objec-tive. The basis of the test was to measure the isolation resistance between the instrument and station grounding systems based on the origi-nal design objective. A letter fron J. Stol: to Toledo Edison Ccapany cated April 7,1977 indicated that we wculd require the com91etion of TP-401.ll testing prior to entering Mode 2.

He understand from telephone discussions with Region III representatives, that it would take several months for the licensee to make the existing grounding system ccnfom to the original design objective.

We conclude based on the limited consequences of safety system failure within tiode 2 that the licensee can proceed to Pode 2 without completig Test Procedure TP 401.11, However, before Davis-Besse 1 can operate in Mode 1 (i.e., >5% rated power) Toledo Edison Company-must document '.ty._,,

they consider the present grounding installation; acceptable for"islant operation in Mode 1.

Following telephone discussions on this matter cn August S and 8,1977, we have scheduled a meeting with Toledo Edison for Wednesday, August 17, 1977 (1:15 - 4:00 PM, Room 372 East-West Towers); f 1

4 orrics*

summanes p oats >

-.- -. - rtfo 21-20 N2 p

-c,o-m m.,om

h 3

9 x

s,.

K. Seygrit gg201 1977 for the purpose of having the licensee present information to the staff to justify plant operation in Mode I with the present installation.

John F. Stolz, Chief Light Water Reactors Branch No. I Division of Project Management cc:

D. Eisenhut J. McGough J. C. Keppler. Region III R. Knop D. B. Vassallo R. McDermott C. Milk r T. Ippolito R. Tedesco i

l

\\

1 099fCW lt Jsto) Med e.......

8/Th7 l

IOC M2M 318 (b76) NRCM 40_,_,, _

_

  • u. s. novenument painnwe orrics, esre _ess.eee

_