Forwards Position Statements Re Emergency Planning Branch Review of Facility Emergency Plan.Info Contained in Plan Through Revision 26 & Fire Hazard Analysis Rept Conform to Reg Guide 1.101.W/o Encl
ML19329C125
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/21/1978
From: Houston R
Office of Nuclear Reactor Regulation
To: Stolz J
Office of Nuclear Reactor Regulation
References
NUDOCS 8002120858
Download: ML19329C125 (2)


Text

g f

n c

, 3, l'

p[fryriff.

DISTRIBUTION

  • M Tf (([g y

MAR 211978 Docket File EPB R/F RWHouston It i'r f Efg Docket flo.50-34G MEMORANDUlf FOR: John F. Stolz, Chief, Light Water Reactors Branch No. 1, DPM FROM:

R. Wayne Houston, Chief, Emergency Planning Branch, DPii SUGJECT:

DAVIS SESSE 1 ffJCLEliR PLANT - FIRE PROTECTION REVIE1 We have perforced an additional review of the Davis Besse Energency Plan in conjunction with the ongoing Fire Protection Program review.

We find that the infer ~.ation providad in the Energency Plan, thrcuch Revision 25 dated January 22, 1977, and the Fire Hazard Analysis Report, Revision 1 (sutnitted by letter dated January 11,1973) does not fully confern to those fire protection elements found in Regulatory Gui fe 1.101, Emergency Planning for Nuclear Power Plants. The enclosed report contains position statements relative to our review for trans-mittal to the appiicant.

ww sgg g WDre HOUStC!I R. Wayne Houston, Chief Emrgency Planning Branch Jivisien of Project Mar.agenent

Enclosure:

Position Statenents cc: w/enclosuro R. Boyd R. DeYoung D. Vassallo D. Skovnoit C. Van Niel L. Engle V. Leung iw EPS:DPf1 DPB:DPM

d

.,,m.

CVandfe4:kb RWHouston

/

3/6/78 3/f /78 I

NRC PORM 318 (9-76).N1 LCM 0240 W us s. eovsanas.m paumme orsicas te70- esses 3 8002120 25-8 b

4 0

432.0 EMERGE? ICY PLANNING BRANCH 1.

The letter of agreement with the Oak Harbor Fire Department states that they will respond to requests for assistance from the Davis Besse plant. The letter does not provide sufficient evidence of the arrangements and agreements reached with this offsite agency.

It is requested that this agreement be revised to more clearly describe the responsibility and authority of the fire department when fighting fires at the site (Regulatory Guide 1.101, Annex A, Section 5.3.2).

2.

The Fire Hazard Recort, Revision 1, at Table 4-1, (Sheet 3) identifies the training and drills provided for the ensite fire brigades and the Oak Harbor Fire Department.

It does not state that tne Fire Department will participate in a fire emergency drill at least annually.

In addition, the Energency Plan at secticns 3.2.6, 8.5, and 9 is neither specific as to the frequen:/

of the drills to be conducted, nor the training provided.