ML19329C008

From kanterella
Jump to navigation Jump to search
SER Suppl 4 Supporting Noise Test Procedures for Tests to Be Conducted on non-Class 1E Circuits Interfacing W/Reactor Protection Channel
ML19329C008
Person / Time
Site: Davis Besse 
Issue date: 06/24/1977
From:
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19329C003 List:
References
NUDOCS 8002110804
Download: ML19329C008 (2)


Text

V ENCLOSURE A SUPPLEMENT REPORT #4 TO THE DAVIS BESSE UNIT 1 SER 50-346 7.2 Reactor Protection System In the published Supplement #1 to the Safety Evaluation Report for Davis Besse Unit fl (dated April 1977), we required the applicant to submit, in addition to the pre,viously proposed fault tests, noise test procedures in accordance with Mil. Standard 19900, Section 4.6.11 (or equivalent). These tests were required to be conducted on non-Class lE circuits that interface with the Reactor Protection System (RPS), in order to demonstrate that the RPS design satisfies the objectives of Section 4.6 of IEEE Std. 279-1968.

In response, the applicant submitted a test procedure for tests that will be conducted on the non-Class lE circuits that interface with one complete reactor protection channel. The proposed test procedure is in accordance with Mil. Standard 19900, Section 4.6.11.

In the submitted noise test procedures, the applicant stated that during the noise tests the RPS channel will be observed for any off normal operation of its Class lE function. The staff 8002110 N b

'interprets this to mean that appropriate instrumentation will be provided (with required accuracy and sensitivity) to monitor and/or record any off normal operation of the Class lE functions.

Based on our review of the noise test procedures and the inter-pretation noted, we conclude that the applicant's response satisfies the staff's requirements stated in the above referenced supplement, and the requirement of the license condition 2C(3)K which was included in the transmittal of license No. flPF-3 dated April 22,1977, and is therefore acceptable.

We will review the test results upon completion of the required testing and will report any concerns identified by the staff in a supplement to this report.

e W