,c OCT 8 1978 00CXET NO.: 50-346 AFPLICAPIT:
Toledo Edison Company FACILITY:
Davis-Besse Unit No. 1 SU?HARY OF PEETING HELD CN SEPTEVBER 10, 1976 TO DISCUSS ENVIR0!PENTAL TECHNICAL SPECIFICATIONS (ETS)
On September 10, 1976, representatives of Toledo Edison Cocpany get with the NRC staff to discuss staff coments en revision 2 to applicant's proposed envircrr, ental technical specifications.
A list of attendees is enclosed.
Significant points discussed are sumarized below:
1.
pH limits. It was agreed that corrective action to be taken in case a limit is exceeded will be specified in the plant precedures raanval.
2.
i'onradiological surveillance. Operational monitoring will comence with comercial operation of the plant.
3.
Chlorine. The ETS will call for a chicrine renitoring program in sectTon 3 and a chlorine bicassay study in section 4.
The ETS will contain no specific limiting condition for operation at this tine.
4.
Other chemicals. The specificaticn will remain as it is.
5.
Fish eggs and larvae entrainment. Routine night sampling will not be specified. A letter from Toledo Edison Capany will comit to a limited special study to compare day and night samples.
O EE W evanaus >
cateh
. ~ _.... _......
Form ABC.)l3 (Rev. 9-55) ABCX 0240 W e. sa sevenmuswv ean=vues arrices esta.see-see IO7 8002070
(
a; P
2 6.
Imoingement study. For each study phase, a decision criterion will be developed by the end of the phase.
. :. :[
e:
Phillip C. Cota. Project. Manager Environmental Projects Branch No.1 Division of Site Safety and Envirorsental Analysis
Enclosure:
List of attendees cc: The Toledo Edison Cor.pany i
.DSE:EP-1..
_05.E:EP-1 o..
PCota:m(D GWKnighton..
10/6/76 10/e /76 S.TS &
fons ABC 318 (Rev. 9-53) AEOt 0240 W u. e. movannaeant reintime arricas ten. sea-ses
e T
' Attendance List
~ Davis-Besse 1 ETS MEETING September 10, 1976 i
NRC P. Cota i
G. Knighton
{
J. Lehr i
C. Hickey L. Engle Applicant - Toledo Edison Company 4
.i E. Novak C. Itekbel D. Cafaro i
C. Herdendorf i.
'l I
i 1
I 1
J 1'
4
- - - - +
-c,
~v
.-n.-.
-,,r,--,
,w---,,,,a,,r~
-,,-c
--,-r---,--,
e
+-,+,r
,m-g
Meeting Summary - Toledo Edison Company - September 10, 1976 Distribution Docket File (Environ) #
flRR Reading EP-1 Reading DSE Reading
!!RC PDR Local PDR HDenton DMuller RVollmer VMoore MErnst WGammill JCollins WKreger GKnighton BJYoungblood WRegan f1Spangler RBallard LHulmaa LEngle J ehr L
Cliickey PCota RFraley, ACRS (16)
I&E(5)
GFess, OELD