Text
-
LICENSEE EVENT REPOh
'\\
cowract stoCs I,, L_ j 1 i fj 8
s
' 'f.'.' 's"
~
6oc =s
~.,..
' JE* '
' *J "c' I
$e10lHIDlBIS11) is l_dj - j,0l 0 : Nl P ]F l -10 [ 3 l l0 l4l1 1l1 1l Ig I
J 1
i.
a
.3 ao 1 J
Co.."K?f ' O.'e'e2U cA
.mc. c.....
e v c.,....
.c.o.,
Cow i t,r-t I : L 10 5 ; O p..; 0: 3 4 ; 6 r (9 ; 6r Q 7 7 g 7
,g6 9 6;29 i l&rL1 1
77; s
is V E
1 1
6.
6.
a.
a I
tvt4f of SCmiritone gg At approximately 1530 hours0.0177 days <br />0.425 hours <br />0.00253 weeks <br />5.82165e-4 months <br /> on June 7, 1977, during Surveillahce Tes't g
' ST 5034.01, it was found that the seismic trigger was not opekating
]
g
' properly. The trigger was firing spuriously.
(NP-33-77-13) g
> es El u\\
I' 7
85 EL 1
- hn" i','#c'
- dNI*c.
I
..To7f'")*.',.
~
eno
, ~, c on, EBl I I E.1
[F_j
[C1KITI BIR1KI LLj v.oo A,e.
lT l 116 6 i LNJ 1
09 so 82 87 4J 44 as as CAUST OtScas* flow
[ The station Instrument and Control' Lab did not determine the cause.
l g i The trigger is being returned to the manufacturer for analysis.
1 as
- h. I s
_I
,o s'eWu's o"esCh""j(NA j
% Powe e oveet e S t A s us av uu i 0:010: 1 1A DeSCovc n, ptiCneef sC.
ii l
7 0
3 80 42 83 it
- 6~
4.
EO As s ove s
- ce ege s aeg&(Asto 08 At a C Ast
. Move.9 or.cf eveTv
,8 LZJ. IZy i NA l
l NA LOCAleon. c, et LC A5C
)
3 9
t la 4.
4g Pt rt5oNNE L (* Po5u8tES g
no-we e ivet or se miev eoe.
[ Of Of Of LZJ l2 NA
,9 u
Pitt10NNt t INJu848t5 e.v-ota ot st e.arec=
O l Oi 01 [ NA
}
Of f 5tti CON $touf %CE5 (NA y
- toss oft DAMAGE 10 8 ACILaty fvet otsca.e so se NA g
PUB LICITY NA l
)
ADOslaomeIt 8 Actufts I NA g
@l Jacque Lingenfelter/Stan Batch (419J'259-5000. Ext. 251 g'
ruouc 8002060 f07 i
e%.
w
~
i s.
TOLEDO EDISON COMPANY DAVIS-BESSE UNIT ONE NUCLEAR POWER STATION SUPPLEMENTAL INFORMATION FOR LER NP-33-77-13 l
y DATE OF EVENT:* June 7, 1977 FACILITY: Davis-Besse Unit 1
. _..__ IDENTIFICATION OF OCCURRENCE: Seismic trigger, which is required to actuate the Seismic Monitoring Systes, was not operating properly.
l i
.g i
Conditions Prior to Occurrence: The station was in Mode 5 with Power (MWE)-0, j
(MWT)-0.
}
Description of Occurrence: At approximately 1530 hours0.0177 days <br />0.425 hours <br />0.00253 weeks <br />5.82165e-4 months <br /> on June 7, 1977, during i
Surveillance Test, ST 5034.01, it was found that the seismic trigger was not operating properly. The seismic trigger.vas firing spuriously.
I L
Desianation of Apparent cause of Occurrence: The station Instrument and Control l
l (I&C) Lab did not determine the cause of this defective behavior. The trigger
)
is being returned to the manufacturer for analysis. The unit was replaced with a non-defective seismic trigger on June 25, 1977, which removed the station from the Action Statement of Technical Specification 3.3.3.3.
Analysis of Occurrence: Since there was no seismic event requiring seismic moni-r toring during the period that the unit was not operating properly, no damage to the health and safety of the public or station personnel occurred.
Corrective Action: The seismic trigger was replaced with a non-defective unit by i
station personnel.
l Failure Data: No previous similar events have occurred.