RO NP-33-17-13:on 770607,seismic Trigger Failed to Operate During Surveillance Test.Cause Undetermined.Seismic Trigger Replaced W/Nondefective Unit
ML19329B918
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/29/1977
From: Batch S, Lingenfelter J
TOLEDO EDISON CO.
To:
Shared Package
ML19329B913 List:
References
NUDOCS 8002060907
Download: ML19329B918 (2)


Text

- -

. - LICENSEE EVENT REPOh ,

s cowract stoCs I,, L_ j 1 i fj 8

'\ ,

~

' 'f.'.' 's" 6oc =s ~., . .

' JE* ' ' ,*J "c' I

$e10lHIDlBIS11) i.

l0 l_dj - j,0l 0 : Nl P ]F l -10 [ 3 l is a

l4l1J 1l1 1lao 1

.3 1 Ig J

I $

cA Co.."K?f ' O.'e'e2U .mc . c . . .. .

e v c . ,.. . . .c.o., ...

Cows i t,r-t 10 5 ; O p ..; 0: 3 4 ; 6 r (9 ; 6r Q 7 7 g 7 isI :VL l&rL1 E 1 ,g6 9 6;29 i 77;

1 1
6. 6. a. >> a I

tvt4f of SCmiritone gg At approximately 1530 hours0.0177 days <br />0.425 hours <br />0.00253 weeks <br />5.82165e-4 months <br /> on June 7, 1977, during Surveillahce Tes't g

g' ST 5034.01, it was found that the seismic trigger was not opekating

  1. ]

> es g' properly. The trigger was firing spuriously. (NP-33-77-13) ".

u\

El85 7

I' EL 1

-

  • hn" i','#c' eno , ~, c on, *dNI*c. I

~

  • EBl I I E .1 [F_j [C1KITI BIR1KI LLj ..To7f'")*.',

lT l 116 6 i.

v.oo A ,e.

1 09 so  : 82 87 4J 44 LNJ as as CAUST OtScas* flow

[ The station Instrument and Control' Lab did not determine the cause. l g ias The trigger is being returned to the manufacturer for analysis. 1

h. I s  ;

_I

,o s'eWu's  % Powe e oveet e S t A s us av 7

ii 0

uu 3

i800:010: 42 1 831A o"esCh""j(NA l

DeSCovc n, ptiCneef sC .

j

4. it *6~ EO As s ove s
  • ce ege s aeg&(Asto 08 At a C Ast . Move.9 or .cf eveTv

,8 i NA LOCAleon. c, et LC A5C 9LZJ . IZy l NA

) l 3 t la 4.  !

4g Pt rt5oNNE L (* Po5u8tES

  • g no-we e ivet or se miev eoe.

[ Of Of Of LZJ .. u l2 NA

  • ,9 Pitt10NNt t INJu848t5 e.v-ota ot st e.arec=

O l Oi 01 [,,NA

}

Of f 5tti CON $touf %CE5 *

(NA y

  • toss oft DAMAGE 10 8 ACILaty -
  • fvet otsca.e so ,

l se NA -

g PUB LICITY NA l

l

, )

ADOslaomeIt 8 Actufts I NA g

@l Jacque Lingenfelter/Stan Batch g' , , , ,

ruouc (419J'259-5000. Ext. 251 -

e%.

8002060 f07 .

i

w ~

i .- , s. -

' TOLEDO EDISON COMPANY DAVIS-BESSE UNIT ONE NUCLEAR POWER STATION SUPPLEMENTAL INFORMATION FOR LER NP-33-77-13 l

  • y DATE OF EVENT:* June 7, 1977 FACILITY: Davis-Besse Unit 1

. _ . .__ IDENTIFICATION OF OCCURRENCE: Seismic trigger, which is required to actuate -

l the Seismic Monitoring Systes, was not operating properly. l i

.g i Conditions Prior to Occurrence: The station was in Mode 5 with Power (MWE)-0, j (MWT)-0.

}

i Description of Occurrence: At approximately 1530 hours0.0177 days <br />0.425 hours <br />0.00253 weeks <br />5.82165e-4 months <br /> on June 7, 1977, during Surveillance Test, ST 5034.01, it was found that the seismic trigger was not operating properly. The seismic trigger.vas firing spuriously. I L

Desianation of Apparent cause of Occurrence: The station Instrument and Control l l (I&C) Lab did not determine the cause of this defective behavior. The trigger

)' is being returned to the manufacturer for analysis. The unit was replaced with a non-defective seismic trigger on June 25, 1977, which removed the station from

, the Action Statement of Technical Specification 3.3.3.3.

r Analysis of Occurrence: Since there was no seismic event requiring seismic moni-toring during the period that the unit was not operating properly, no damage to the health and safety of the public or station personnel occurred.

Corrective Action
The seismic trigger was replaced with a non-defective unit by i station personnel.

l Failure Data: No previous similar events have occurred.