RO NP-33-17-13:on 770607,seismic Trigger Failed to Operate During Surveillance Test.Cause Undetermined.Seismic Trigger Replaced W/Nondefective Unit
ML19329B918
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/29/1977
From: Batch S, Lingenfelter J
TOLEDO EDISON CO.
To:
Shared Package
ML19329B913 List:
References
NUDOCS 8002060907
Download: ML19329B918 (2)


Text

-

LICENSEE EVENT REPOh

'\\

cowract stoCs I,, L_ j 1 i fj 8

s

' 'f.'.' 's"

~

6oc =s

~.,..

' JE* '

' *J "c' I

$e10lHIDlBIS11) is l_dj - j,0l 0 : Nl P ]F l -10 [ 3 l l0 l4l1 1l1 1l Ig I

J 1

i.

a

.3 ao 1 J

Co.."K?f ' O.'e'e2U cA

.mc. c.....

e v c.,....

.c.o.,

Cow i t,r-t I : L 10 5 ; O p..; 0: 3 4 ; 6 r (9 ; 6r Q 7 7 g 7

,g6 9 6;29 i l&rL1 1

77; s

is V E

1 1

6.

6.

a.

a I

tvt4f of SCmiritone gg At approximately 1530 hours0.0177 days <br />0.425 hours <br />0.00253 weeks <br />5.82165e-4 months <br /> on June 7, 1977, during Surveillahce Tes't g

' ST 5034.01, it was found that the seismic trigger was not opekating

]

g

' properly. The trigger was firing spuriously.

(NP-33-77-13) g

> es El u\\

I' 7

85 EL 1

  • hn" i','#c'
  • dNI*c.

I

..To7f'")*.',.

~

eno

, ~, c on, EBl I I E.1

[F_j

[C1KITI BIR1KI LLj v.oo A,e.

lT l 116 6 i LNJ 1

09 so 82 87 4J 44 as as CAUST OtScas* flow

[ The station Instrument and Control' Lab did not determine the cause.

l g i The trigger is being returned to the manufacturer for analysis.

1 as

h. I s

_I

,o s'eWu's o"esCh""j(NA j

% Powe e oveet e S t A s us av uu i 0:010: 1 1A DeSCovc n, ptiCneef sC.

ii l

7 0

3 80 42 83 it

  • 6~

4.

EO As s ove s

  • ce ege s aeg&(Asto 08 At a C Ast

. Move.9 or.cf eveTv

,8 LZJ. IZy i NA l

l NA LOCAleon. c, et LC A5C

)

3 9

t la 4.

4g Pt rt5oNNE L (* Po5u8tES g

no-we e ivet or se miev eoe.

[ Of Of Of LZJ l2 NA

,9 u

Pitt10NNt t INJu848t5 e.v-ota ot st e.arec=

O l Oi 01 [ NA

}

Of f 5tti CON $touf %CE5 (NA y

  • toss oft DAMAGE 10 8 ACILaty fvet otsca.e so se NA g

PUB LICITY NA l

)

ADOslaomeIt 8 Actufts I NA g

@l Jacque Lingenfelter/Stan Batch (419J'259-5000. Ext. 251 g'

ruouc 8002060 f07 i

e%.

w

~

i s.

TOLEDO EDISON COMPANY DAVIS-BESSE UNIT ONE NUCLEAR POWER STATION SUPPLEMENTAL INFORMATION FOR LER NP-33-77-13 l

y DATE OF EVENT:* June 7, 1977 FACILITY: Davis-Besse Unit 1

. _..__ IDENTIFICATION OF OCCURRENCE: Seismic trigger, which is required to actuate the Seismic Monitoring Systes, was not operating properly.

l i

.g i

Conditions Prior to Occurrence: The station was in Mode 5 with Power (MWE)-0, j

(MWT)-0.

}

Description of Occurrence: At approximately 1530 hours0.0177 days <br />0.425 hours <br />0.00253 weeks <br />5.82165e-4 months <br /> on June 7, 1977, during i

Surveillance Test, ST 5034.01, it was found that the seismic trigger was not operating properly. The seismic trigger.vas firing spuriously.

I L

Desianation of Apparent cause of Occurrence: The station Instrument and Control l

l (I&C) Lab did not determine the cause of this defective behavior. The trigger

)

is being returned to the manufacturer for analysis. The unit was replaced with a non-defective seismic trigger on June 25, 1977, which removed the station from the Action Statement of Technical Specification 3.3.3.3.

Analysis of Occurrence: Since there was no seismic event requiring seismic moni-r toring during the period that the unit was not operating properly, no damage to the health and safety of the public or station personnel occurred.

Corrective Action: The seismic trigger was replaced with a non-defective unit by i

station personnel.

l Failure Data: No previous similar events have occurred.

L 9

5 s

l

~....

.