Text
.
~..
LICE.NSEE ' EVE!JT REPOR s s,
coveriot stoca L.1 i ' i 1,
' 'f.'.':.' ' '
. c ~ s i ~.,....
' 'N.~."
< *J.~,'
$,10111 I DIB l S ill
}j_01-J010iNIPIPl-10131 1 4 1 lj ljl ilj pj a n n
.......v m : :....t::
...o.,o...
l,g O ! 5 t 0,..; 0 ; 3 4! i 6 06 i1 3 7:7 i.id i 1
7 61 7!7 7
con 1 L
1 1
1]
t.t
, o, tc....o..
~
g g During a routinc inspection and servicing of the Meteorologicdl Monitoring i as y
@]l System it was d,iscovered the wind speed indicator at Elevatiod 827 feet a es a
lie]l, above ses level was not indicating procarly.
This placed us into an l
@ l Action Statement in Technical Specificatien 3.3.3.4.
(NP-33-77-12)
]
8.L i
3
@l 1 fh!NI~' T[ Ut
"}
[*~
T
)
89 80 68 42 63 43 44 4;
ag caust c,tsceirvios LBearings in the wind speed transmitter were found to be defective, and l
@ hhe wind speed transmitter was replaced.
]
e3 o
EEDI i
\\7 85 sc 8 [eLB_J
! d*!Ef0-NA I
(B_J L.c A rt 1
O s eet a s t a tus u,SEONa v oeScovt av DESCnerf tC9 1
N e,,,j,,,,
io o
o
.4 aer s e ve s,
e r.*w s t n e
- L
^D 08 a C a tt 6.ou% t or ac t ive t v LoCatoom O'.(Ltatt 7
8 s
1C
.I e e4 eb M
- t '150NN1.L t a PCivrt t 5 A vens e tv.f of
.e.t o.N I
I.2 I
o.
m PtR1cNN(ttNJUHf&$
m uw o r. a na sc aie r som 8.'O!O!01
[ NA
\\
I OFFSitt C:seStOLJtNCES A
g ind
- LOS$ Oft cananut to e ac1Lef v evre og g e.....o,
['D,qu g NA 3
futteC8,v 81 NA 3
SS y
ADOst OM AL f ACIOfis PD. ', "^
J 86 V
Jacque ungenfenedStan Smh (419} 259-5000, Ext.. 251 3002060 77,
4 s
I TOLEDO EDISON COMPANY
/
DAVIS-BESSE UNIT ONE NUCLEAR POWER STATION SUPPLEMENTAL INFORMATION FOR LER NP-33-77-12 DATE OF EVENT: June 13, 1977 FACILITY: Davis-Besse Unit 1 IDENTIFICATION OF OCCURRENCE: The wind speed indicator at Elevation 827 feet above sea level was not indicating properly.
Conditions Prior to Occurrence: The plant was in Mode 5.
Power: (MWE) 0, (MWT) 0 Description of Occurrence: At approximately 0930 hours0.0108 days <br />0.258 hours <br />0.00154 weeks <br />3.53865e-4 months <br /> on June 13, 1977 during weekly inspection of the Meteorological Monitoring System by station personnel ~,
it was discovered that the wind speed indiencor at 827 feet above sea level was not indicating properly.
NUS, the firm responsible for maintenance on the tower, l
was notified as to the nature of the occurrence.
j Designation of Aeparent Cause of Occurrence:
NUS found the bearings in the wind
)
speed indicator to be defective and replaced the entire unit with one that had been previously tested and calibrated. The unit was replaced by 1400 hours0.0162 days <br />0.389 hours <br />0.00231 weeks <br />5.327e-4 months <br /> on June 14, 1977, which restored proper indication and removed the station from the Action Statement of Technical Specification 3.3.3.4.
Analysis of occurrence:
Since there was no radioactive release requiring meteoro-logical monitoring during the period that the unit was inoperable, no danger to the health and safety of the public or static.' personnel occurred.
l Corrective Action: The entire wind speed transmitter was replaced with a cali-brated and tested unit by NUS. This transmitter has been and will continue to be replaced by NUS on a regular basis at three month intervals. This incident is considered unique and would not usually occur because of the preventative main-tenance by NUS.
Failure Data: No previous similar events have occurred.
l
~~.
1
~
i
.. A......
--_