RO NP-33-77-12:on 770613,wind Speed Indicator at Elevation 827 Ft Above Sea Level Found Not Indicating Properly During Routine Meteorlogical Monitor Insp.Caused by Defective Bearings in Wind Speed Transmitter.Transmitter Replaced
ML19329B904
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/07/1977
From: Batch S, Lingenfelter J
TOLEDO EDISON CO.
To:
Shared Package
ML19329B837 List:
References
NUDOCS 8002060897
Download: ML19329B904 (2)


Text

.

~..

LICE.NSEE ' EVE!JT REPOR s s,

coveriot stoca L.1 i ' i 1,

' 'f.'.':.' ' '

. c ~ s i ~.,....

' 'N.~."

< *J.~,'

$,10111 I DIB l S ill

}j_01-J010iNIPIPl-10131 1 4 1 lj ljl ilj pj a n n

.......v m : :....t::

...o.,o...

l,g O ! 5 t 0,..; 0 ; 3 4! i 6 06 i1 3 7:7 i.id i 1

7 61 7!7 7

con 1 L

1 1

1]

t.t

, o, tc....o..

~

g g During a routinc inspection and servicing of the Meteorologicdl Monitoring i as y

@]l System it was d,iscovered the wind speed indicator at Elevatiod 827 feet a es a

lie]l, above ses level was not indicating procarly.

This placed us into an l

@ l Action Statement in Technical Specificatien 3.3.3.4.

(NP-33-77-12)

]

8.L i

3

@l 1 fh!NI~' T[ Ut

"}

[*~

T

)

89 80 68 42 63 43 44 4;

ag caust c,tsceirvios LBearings in the wind speed transmitter were found to be defective, and l

@ hhe wind speed transmitter was replaced.

]

e3 o

EEDI i

\\7 85 sc 8 [eLB_J

! d*!Ef0-NA I

(B_J L.c A rt 1

O s eet a s t a tus u,SEONa v oeScovt av DESCnerf tC9 1

N e,,,j,,,,

io o

o

.4 aer s e ve s,

e r.*w s t n e

    • L

^D 08 a C a tt 6.ou% t or ac t ive t v LoCatoom O'.(Ltatt 7

8 s

1C

.I e e4 eb M

  • t '150NN1.L t a PCivrt t 5 A vens e tv.f of

.e.t o.N I

I.2 I

o.

m PtR1cNN(ttNJUHf&$

m uw o r. a na sc aie r som 8.'O!O!01

[ NA

\\

I OFFSitt C:seStOLJtNCES A

g ind

  • LOS$ Oft cananut to e ac1Lef v evre og g e.....o,

['D,qu g NA 3

futteC8,v 81 NA 3

SS y

ADOst OM AL f ACIOfis PD. ', "^

J 86 V

Jacque ungenfenedStan Smh (419} 259-5000, Ext.. 251 3002060 77,

4 s

I TOLEDO EDISON COMPANY

/

DAVIS-BESSE UNIT ONE NUCLEAR POWER STATION SUPPLEMENTAL INFORMATION FOR LER NP-33-77-12 DATE OF EVENT: June 13, 1977 FACILITY: Davis-Besse Unit 1 IDENTIFICATION OF OCCURRENCE: The wind speed indicator at Elevation 827 feet above sea level was not indicating properly.

Conditions Prior to Occurrence: The plant was in Mode 5.

Power: (MWE) 0, (MWT) 0 Description of Occurrence: At approximately 0930 hours0.0108 days <br />0.258 hours <br />0.00154 weeks <br />3.53865e-4 months <br /> on June 13, 1977 during weekly inspection of the Meteorological Monitoring System by station personnel ~,

it was discovered that the wind speed indiencor at 827 feet above sea level was not indicating properly.

NUS, the firm responsible for maintenance on the tower, l

was notified as to the nature of the occurrence.

j Designation of Aeparent Cause of Occurrence:

NUS found the bearings in the wind

)

speed indicator to be defective and replaced the entire unit with one that had been previously tested and calibrated. The unit was replaced by 1400 hours0.0162 days <br />0.389 hours <br />0.00231 weeks <br />5.327e-4 months <br /> on June 14, 1977, which restored proper indication and removed the station from the Action Statement of Technical Specification 3.3.3.4.

Analysis of occurrence:

Since there was no radioactive release requiring meteoro-logical monitoring during the period that the unit was inoperable, no danger to the health and safety of the public or static.' personnel occurred.

l Corrective Action: The entire wind speed transmitter was replaced with a cali-brated and tested unit by NUS. This transmitter has been and will continue to be replaced by NUS on a regular basis at three month intervals. This incident is considered unique and would not usually occur because of the preventative main-tenance by NUS.