ML19329B823

From kanterella
Jump to navigation Jump to search
Responds to NRC .Forwards Verification for Compliance W/App G Pressure-Temp Limits During Startup & Shutdown. Concludes No Design Mods or Changes to Operating Procedures Needed for First Five Effective Full Power Yrs
ML19329B823
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/07/1976
From: Roe L
TOLEDO EDISON CO.
To: Stolz J
Office of Nuclear Reactor Regulation
Shared Package
ML19329B824 List:
References
NUDOCS 8002060841
Download: ML19329B823 (2)


Text

NRC FOn.s JD5 u.s. NUCLEAR REGULATORY COVMISSION DOCKET NUMIEr (2 78' 50-346 NRC DISTRIBUTION FON <> ART 50 DOCKET MATERI AL TO: J J. STOLZ FROM: TOLEDO EDISON CO.

DATE OF OOCUMENT TOLEDO, OHIO 12-7-76 L.E. ROE DATE RECEIVE 7 l

12-13-76 I

OLETTER ONOTOnizte PROP iNevTFORM NUMBER OF COPIES RECEsVED ClO rig 4N AL O UNC LASSIFIE D OCOev 1

EN CLOSU R E DESCRIPTION LTR. RE. OUR 10-1-76 LTR....TRANS THE FOLLOW-VERIFICATION FOR* COMPLIANCE WITH APPENDIX G ING......

PRESSURE T:2"PERATURE LIMITS DURING STARTUP AND SHUTDOWN.......

DISTRUBUTION PER: L. ENGLE 12/14/76

( 1 SIGNED CYS RECEIVED)

( 5 PAGES)

_____77 PLANT NAME:

CAVIS BESSE

-~

m,,,

m - _1

~ J b /

"-N-#D SAFETY FOR ACTICNe tNFOa?.tATION rwTnn

/' ASSIGNED AD:

V 4\\ s -:5. A O O AssTc*mn An.

2BARCH_ CHIEF!

STOLZ nRA"E" r"T' -

JRQJECT MANAGI3:

[ M(&lL PROJECT MANAGER:

Z.LIC. ASST., !

HYLTON LIC. ASST. :

1 INTERNAL DISTRISUTION EmG fit" 3 SYSTEMS SAFETY PLANT SYSTEMS SITE SAFETY _5

/

h s run IIEINEMAN TEDE_S_00 EN"T20 A"2LYSTE I&E (2)

SCHROEDER BENAROYA DI NTON & ITT T c' OELD LA TN R GOSSICK & STAFF ENGINEERING IPPOLITO ENVIRQ_.,IEcti.

MIPC MAC.1PGY I

KIRKN00D ERNST CASE KNIGliT I

BALLARD llANAUER I

SIliWEIL l

OPERATING REACTORS I SPANGLER 1!ARLESS I PAULICKI i

STELLO I

SITE TECH.

PROJECT MANAGEMENT I

REACTOR SAFETY l OPERATING TECH.

CAFCIILL BOYD

/' ROSS EISEIGIUT STEPP P. COLLINS

/

NOVAK (40 Si!AO H"I. MAN

__.IIOUSTON

/

ROSZTCCZY BAER PL.T_ERSON C11ECK Bl[rLER SITE ANALYSIS MELTZ GRIMES VOLLMER llELTEMES AT & I BUNC11 SKOV110LT SALI2".AN J. COLLINS RUTBERG KR2CER EX TERN AL DISTRIBUTlGN CONTROL NUMGEd 2.LPDR: PORT CLINTON,MD NAT,_ LAB:

IMOLL'1tAVEM_liAT. 13n.

TIC _:

REG _V.IE U_LRIKSON (ORNL)

NSIC:

IA PDR A

~.

ASLB:

CONSUI.TANTS :

ACRS CYS 110_LDIjiGfg}T T

Nac r onu in 42.;ni 8002060

/

=

..,.,__[

^

.i,

.a.

-m M

EbYSON N.

  1. h a?-

ce c7-":q O

LOWELL E. ROE Docket No. 50-346

/;/

y;un y'-

y,,,,,,,,,

/.

..co.o

........m lj/ ll - U
  • N '.>

i, December 7, 1976 ram 258-5242

' $., 2. ee:.: -anmt ml' Serial No. 163 ce m:

Ae

,4

- A

.t.d 0.aW4 N'

N'h M [',

Director of Nuclear Regulation Attn:

Mr. John F. Stolz, Chief A,.

Light Water Reactors Branch No. 1 L

Division of Project Management

,s M 'J. g.'_' :'

United States Nuclear Regulatory Commission

' /

,s..

Washington, D.C.

20555

Dear Mr. Stolt:

In response to your letter dated October 1, 1976, we have prepared the attached " Davis-Besse Nuclear Power Station Unit 1 Verification for Compliance With Appendix G Pressure-Temperature Limits During Startup and Shutdown." This analysis shows that for the first five effective full power years of operation the design and operation of the Davis-Besse Unit 1 is such that no single equipment failure or single operator error will result in 10 CFR Part 50 Appendix G limitations being exceeded and that no common equipment failure would both cause a pressure transient and render the mitigating equipment inoperable. Hence, the analysis concludes that for the first five effective full power years of operation no design modifications or change to operating procedures for the unit are necessary.

Yours very truly, pc 29/58

Attachment:

Davis-Besse Nuclear Power Station Unit i Verification for Compliance With Appendix G Pressure-Temperature Limits During Startup and Shutdown

(*.,,. OUI-THE TCLEDO EDISCN CCMPANY ECISCN PLAZA 300 MACISON AVENUE TCLEDO, OHIO 43652