ML19329B817

From kanterella
Jump to navigation Jump to search
Forwards RO NP-32-77-33
Date released: 12/09/2019 Download: ML19329B817


RO NP-32-77-13:on 770815,battery Electrolyte Level Exceeded Max Accepted Level for Batteries 1P,1N,2P & 2N.Caused by Batteries Bein on Equalize Charge to Correct Low Voltage. Excess Siphoned from Affected Battery
ML19329B859
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/26/1977
From: David Brown, Lingenfelter J
TOLEDO EDISON CO.
To:
References
Download: ML19329B859 (2)
Forwards RO NP-32-77-33
ML19329B816
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/26/1977
From: Roe L
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19329B816 (1)