ML19329B794

From kanterella
Jump to navigation Jump to search
Notifies of Region 3 Determination That License NPF-3, Attachment 2,Items F.1,F.2 & F.4 Completed.Item F.3 Resolved Pending Util Commitment to Tests Described by NRC at 770825 Meeting.Approves Proceeding to Mode 1
ML19329B794
Person / Time
Site: Davis Besse 
Issue date: 08/29/1977
From: Sniezek J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Boyd R
Office of Nuclear Reactor Regulation
References
NUDOCS 8002060823
Download: ML19329B794 (1)


Text

<

I g23 5; DISTRIBUTION:

IE FILE IE READING ROI READIfiG PEMORANDUM FOR:

R. S. Boyd, Director, Division of ProjefgFC CHRON File 50-s_o Management, HRR GRKlingler FROM:

J. H. Sniezek, Assistant Director for Field Coordination, Division of Reactor Operations Inspection IE I

l SU3 JECT:

TOLEDO EDIS0il - DAVIS BESSE LTIIT t10.1 (m-34)

DN 50 i

Region III has informed us that based on their inspection efforts, they have deterained that items F.1, F.2 and F.4 in Attach.nent 2 to license HPF3 have been completed.

4 Based on an understanding reached with the licensee during a smeting August 25, 1977, we consider Item F.3 resolved s::bject to the licensee committing to perform the tests to be described by NRR.

i l

IE sees no impedinent for the licensee to proceed to Mode 1 (Power Operation).

i J. H. Sniezek, Assistant Director for Field Coerdination Division of Rezetor Operations Inspection, II cc:

H. D. Thomburg, IE E. L. Jordan, IE N. M. Haller, IE N. C. Moseley, IE i

I I.

u.

1 FC:R0I:IE ADFC:ROI:IE l

GRKlingler:L] JHSniezek 77 g

8/26/77 8/ /77 g

NRCFORM 318 (9 76) NRCM 0240 h u. s. aovannusme rninvine o,. c.isy _ m.

8002060 M p