ML19329B794
| ML19329B794 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 08/29/1977 |
| From: | Sniezek J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| To: | Boyd R Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8002060823 | |
| Download: ML19329B794 (1) | |
Text
<
I g23 5; DISTRIBUTION:
IE FILE IE READING ROI READIfiG PEMORANDUM FOR:
R. S. Boyd, Director, Division of ProjefgFC CHRON File 50-s_o Management, HRR GRKlingler FROM:
J. H. Sniezek, Assistant Director for Field Coordination, Division of Reactor Operations Inspection IE I
l SU3 JECT:
TOLEDO EDIS0il - DAVIS BESSE LTIIT t10.1 (m-34)
DN 50 i
Region III has informed us that based on their inspection efforts, they have deterained that items F.1, F.2 and F.4 in Attach.nent 2 to license HPF3 have been completed.
4 Based on an understanding reached with the licensee during a smeting August 25, 1977, we consider Item F.3 resolved s::bject to the licensee committing to perform the tests to be described by NRR.
i l
IE sees no impedinent for the licensee to proceed to Mode 1 (Power Operation).
i J. H. Sniezek, Assistant Director for Field Coerdination Division of Rezetor Operations Inspection, II cc:
H. D. Thomburg, IE E. L. Jordan, IE N. M. Haller, IE N. C. Moseley, IE i
I I.
u.
1 FC:R0I:IE ADFC:ROI:IE l
GRKlingler:L] JHSniezek 77 g
8/26/77 8/ /77 g
NRCFORM 318 (9 76) NRCM 0240 h u. s. aovannusme rninvine o,. c.isy _ m.
8002060 M p