ML19329B766

From kanterella
Jump to navigation Jump to search
Forwards LER 77-017/01T-0
Date released: 12/09/2019 Download: ML19329B766


LER 77-017/01T-0:on 771020,both Auxiliary Feed Pump Suctions Lined Up to Deaerator Storage Tanks W/O Cooling Water Supply Shifting to Svc Water,Resulting in Water Greater than 200 F as Cooling Water for Auxiliary Feed Pump Bearings
ML19329B907
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/01/1977
From: Chesko R
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19329B907 (3)
Forwards LER 77-017/01T-0
ML19329B765
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/01/1977
From: Murray T
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19329B765 (1)