ML19329B729

From kanterella
Jump to navigation Jump to search
Forwards Instrumentation & Control Sys Branch SER, Suppl 3.Lists Outstanding Items
ML19329B729
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 04/08/1977
From: Tedesco R
Office of Nuclear Reactor Regulation
To: Vassallo D
Office of Nuclear Reactor Regulation
Shared Package
ML19329B731 List:
References
NUDOCS 8002060738
Download: ML19329B729 (2)


Text

4 l

AAPR 3@],

Decket No. S0-346 MEMORANGU'l FOR: Comenic B. Vassallo, Assistant Director for Light Water Reactors. DPM FROM:

Robert L. Tedesco, Assistant Director for Plant Systens DSS SUNECT:

DAVIS RES.cE UMIT 1 SAFETY EVALUATION REPORT SUPPLE;!ENT ! 3 Plant ?!ame:

Davis Besse Unit 1 Docket a nber:

50-34G Licensing Stage:

CL

!!ilestane Number:

27-22 Rosconsible Branch LWR 2 and Project Manager:

L. Engle Requested Completion Date:

N/A The DSS:PS, Instrurentation and Control Systems ?, ranch supplemental input ! 2 to the Davis Besse Unit 1 Safety Evaluation Report (SER) dated Dececher 1975, was transnitted by memorandun to you on March 2,1977.

That input was based on our review of the FSAR through /c.endnent 43.

Sone, but not all, of the item identified in the criv4cus transmittal have been resolved. The follcuing items are thosa that have not been satisfactorily resolved and renain as outstanding items. We will recort on our evaluation of these open items in the next supplement to the Safety Evaluation Report.

1.

Final acproval of the routing of Class lE wiring tith non-Class lE wiring within Class lE logic cabinets and Danels. Resolution subject

1) Review and approval of " noise test" procedures yet to be su bitted and 2) Completion of tne fault tests and suMit test results for our review, orfor to the first refuelird (i.e. as stated in SSER f 3 Section 7.2).

To ensure that these matters are acceptably resolved,we believe that it nay be necessary to include them as licensing conditions. We are available to discuss this ascect with you.

Contact:

A. J. Szukiewicz w.,,

X27387 orrses >

evanaus >

oavu >

Form ABC.318 (Rev. 753) ABCM 0240

  1. u. s. oovsanuswr enintime oprics: sove.sae.see 8002060737

c 2.

Final approval of the Class 1E electrical distribution system (i.e., the Millstone 2 concerns).

Resolution subicct to receipt of the applicant's conclete analysis, yet to be submitted. See memorandum from A. J. Szukiewic: to L. Enqle dated f! arch ??, 1977, regarding the current status of this item (i.e. Item 3 of the reference memo). An acceotable response is required before Ocwer operation is permitted.

c.c

,. -i ; 4 wt

~ L. ~ 3 Robert L. Tedesco, Assistant Director for Plant Systems Division of Systems Safety

Enclosure:

DISTRIBUTION:

As Stated DOCKET FILE NRR READING FILE cc:

S. Fanauer ICSB READING FILE R. t!einenan PS READING FILE R. Boyd A. SZUKIEWICZ W. McCcnald T. Ippilito J. Stolz L. Engle C. Miller

't. Srinivasan F. Jablonski (Region III)

F. Rosa 2

r NICS'BYts PS: k N PSrfjSPh

~ DSS:PSh

.,m.,

E$zukieWcx: )ob C.eNiller f7gp61Mo R. Tedesco

  • * " ' "
  • Af(R7 4/Gl77 4/Jf77 Al7/+7 Perun E315 (Esw. >53) AM'M 0340
  1. u.s. sovsmosessuv ensamese orricas ieva.sas see