ML19329B709

From kanterella
Jump to navigation Jump to search
Requests Appropriate Region 3 Personnel Attend ACRS Subcommittee 761221 Meeting.Lists Subjs to Prepare
ML19329B709
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/13/1976
From: Engle L
Office of Nuclear Reactor Regulation
To: Roy G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NUDOCS 8002060718
Download: ML19329B709 (1)


Text

D 0

Distribu,tfon

? "O I

A DEC 13 I3h Docket Fi r

-]-[

LWR 1 File 2

L. Engle o

E. Hylton J. Stolz Docket :lo. 50-346 ME"CRA:lDUM FOR: Gen W. Roy, Chief, Field Coordination and Enforcceent Branch, Office of Inspection and Enforcement FRGM:

L. Engle, Project Manager, Light Water Reactors Branen tio. 1, CPM,

i..:j w.

3 TliRU:

J. F. Stolz, Chief, Light Water Reactors Branc VM No. 1. DPM SUDJECT:

REQUESTED ISE (REGION 3) ATTE!!D*d4CE AT Tl!E DMIS BESSE, UtilT 1 ACRS SUSC0!C!ITTEE MEETI iG (DECE."CER '1,1375)

We request that the appropriate ISE (Pegion 3) personnel be ;2 resent at tne ACRS subcomittee for Davis Besse, Unit 1.

The ACRS subcomittpa meeting will be held on December 21, 1976 in Washington, D. C. at the li Street office beginning at 9:30 AM.

lo preparad testinony is necessary, but tne appropriate personnel snould be ready to address the following subjects:

1.

Paint test results on the inner surface of the steel vessel contair.nent structure.

2.

Status rescrt on preoperational tests required prior to issuance of oDerating l#canse.

3.

Status report by ISE (Region 3) on facility insrections of safety redundant electrical system.

These matters have already been discussed with Mr. D. Hayes of.7egion33.

Orisien1 Sisted DE Leen 3. T sle /

L. Engle, Project Manager Light Water Reactors Branch No. 1 Division nf Project t'anagement 50-3 US My LWR.1.

. ~L..W. R -

.LEngle r..ed.

_..J....S...t.o_l...

020 6 /[

~

eu...

12/.?C/.76.... _

._12Lg/76 M

Ferin AEC 31a tRev. 9-53) AICM 0240

  1. v. e ooyannusur pamrine orrics: so?.sas see

,