ML19329B700
| ML19329B700 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 12/16/1976 |
| From: | Stolz J Office of Nuclear Reactor Regulation |
| To: | Sniezek J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| NUDOCS 8002060710 | |
| Download: ML19329B700 (1) | |
Text
_
~
~.
~
.w Distribution Docket fit, DEC 16 1976 LWR 1 File J. Stolz L. Engle E. Hylton Occket ilo. 50-346 ME!10RANDUti FOR:
J. !!. Sniczek, Chief, Light Water Reactor Programs Branch, I&E FR0ft:
J. F. Stolz, Chief Light Water Reactors Branch No.1, CP'1
SUBJECT:
CELETIGil OE tlATURAL CIRCULATIO 1 TEST - TOLEDO EDISON C0?!PA4Y (OAVIS BESSE, UtlIT 1)
Pursuant to your amorandum of December 1,1976, we have evaluated the need for requiring a natural circulation test as specified in Regulatorv Guide 1.63 for the elevated steam generator design for Davis Besse, Unit 1 (00-1).
The Toledo Edison Company has r.ot presented any supporting bases in the FSAR wnereby we can compare the efficiency of the raised loop design for J3-1 to tne results for the Oconce 177 FA lowered loop natural circulation tes t.
Therefore, since Davis Besse, Unit 1 is the lead facility for the Oconee 177 FA raised loop design, it is the staff's position that the natural circulation test be conducted for 08-1 during the power escalation chase of testing and that tne DB-1 FSAR be amended to include tne natural circulation test as specified in Requistory Guide 1.68.
Should you have any further questions, please call us.
Origua! S!sned by' John l'.Stols J John F. Stolz, Chief Light W;ter Reactors Branch No.1 Division of Project l'.anagement 50-3 %
+
_LEng. _ _
JS son..
_.12/3/16._
12/4/
Form AEC-318 (Rev. 943) AICM 0240 W u. e. eovsanassar paintine oprics: se74.sas. nee 8002060 7/9 M,