s FS!0RA'iDUli FOR: Leon Engle, Project Manager, Division of Project Management FROM:
Vince Leung, Auxiliary Systems Branch, Divisionoof Systems Sa fety
SUBJECT:
DAVIS-BESSE 1 - FIRE PROTECTION REVIEW As part of our fire protection program review, we are planning a site visit to Davis Besse Nuclear Power Station, Unit No.1 on May 9-11, 1978. The purpose of the scheduled visit is to review the fire protec-tion provided for Savis Besse, Unit No.1 safety relatad areas. It will also enable NEC personnel and their consultants to obtain first hand infomation needed for verification and evaluation of Davis Besse's fire protection analysis report. We plan to arrive at the site at 8:45 a.m., liay 9,1978.
Attacaed is the agenda for the site visit and a list of the personnel expected to participate in the vist t.
Vincent Leung Auxiliary Systrns Branch Division of Systens Safaty
Enclosures:
As stated cc:
V. Benaroya T. Ippoli'a C. Miller P. Matthews G. Harrison A. Rosa A. Suzkiewicz M. Fields DISTRIBUTION:
C0CKET FILES ftRR READING PS READING ASB READING r',
VLEUNG l
s; i
DSS:P DSS:PS:ASB a m.a w 4-V g:
P VBenarayag 04/10/78__
04//0/.78.
.04/P/78.
N mac mau 3:s p.m NRCM 024
- u. mmmusunalMTING Op1CSa Im a m 8002060 70 3
l :e. -
f o
a d
1
. Participants to the Site Visit I
).
NUCLEAR REGULATORY COMMISSION GAGE-BABC0CK & ASSOCIATES,-INC.
4 L. Engle J. Behn r
l P. Matthews*
l G. Harrison.
T l
'A. Szukiewic:
1 l
M. Fields j-V. Leung 3
k 5
7 I.
I j
Cne day l
s s
J i
i 4-4 1
m r
.~;.n
~,.. - -
-.-.-p-a
,-,,w-..-,.-s e.,,.,-n,-
--ey-
.-...,n
---e+
)
ENCLOSURE II AGENDA FOR SITE VISIT - FIRE PROTECTION 1.
Introduction by NRC Purpose of Visit a.
b.
Method of Site Review 2.
Comments by Licensee Any restrictions a.
b.
Brief dese:1ption of plant layout 3
Ad=inistrative Controls Discuss:
Fire Protection Organization a.
b.
Fire Hazard Control C.
Control of Ignition Sources d.
Fire 3rigade Organt:ation and Training Plant Personnel Indoctri=ation e.
f.
Fire Fighting Plans Quality Assurance for Fire ? otectica g.
h.
Controls over Fire ?rotectics Syste=s.
4.
Plant Review Examine each of the following safety-related areas:
a.
(1) Control Room /Co=puter Roo: Area (2) Cable Spreading Koom (3) Battery Roo=s (4) Diesel Cenerator Roc =s (5) Switchgear Roo=s (6) Safety-Related Pu=p Areas Fuel Building (7)
Borated '4ater Storage Tank and Reactor 3uilding Spray (8)
Chemical Additive Tanks (9) Contain=ent (where accessible)
Examine other areas / hazards, including:
b.
Turbine lubrication and control oil storage and use areas.
(1)
Diesel Fuel / Auxiliary 3 oiler Fuel Oil Storage Tanks (2)
(3) Radwaste Area (4) Ceconta=ination Area (5) Records Storage Area T
I
.a
_2 (6) Auxiliary Boiler Area Fire Pump Areas (7) 011 Filled Transformers (Indoor and Out door)
(8)
(9) Hydrogen - Storage, use, and processing areas As applicable, the above areas will be examined for:
c.
(1) General conditions, congestion, and accessibility (2) Separation between redundant trays and conduits (3) Earriers and fire stops (4) Fire detection and suppression equipment (5) Vantilation Syste=s and controls (6) Floor drains (7) Communications equip =ent (8) Lighting (9) Cembustible materials (10) Equipment protection fro = vater damage (11) Ability to contain fire, or isolate from external fire (12) Peans for containing oil spills (13) Maans for detecting hydrogen accu =ulation or loss of ventilation (battery roo:s)
)
1