Summary of ACRS Subcommittee 761221 Meeting in Washington,Dc Re OL License Review.Recommends Review Be Continued at Full ACRS Meeting on 770106
ML19329B655
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/29/1976
From: Engle L
Office of Nuclear Reactor Regulation
To:
NRC COMMISSION (OCM)
References
NUDOCS 8002050764
Download: ML19329B655 (5)


Text

'

D D

o o Jl DEC 2 9 0

' 9

~ T[

b mD I970 v

L J

Docket ilo. 50-346 APPLICNiT: Toledo Edison Company FACILITY:

Davis-Besse iluclear Power Station, Unit 1 SUffiARY OF ACRS SUBC0ffiITTEE.4EETI?iG As part of its review of the application of Toledo Edison Connany, et al for a license to operate the Davis-Besse iluclear Power Station, Unit 1, an ACRS Subcorriittee (C. P. Seiss, '4. W. Carbon, and J. C. Ebersole),

held a public meeting on December 21,1976 at 1717 H Street, 't.'.f.,

Hash-ington, D.C.

The neeting followed closely the planned agerda (enclosed). % mal transcripts are available which include copies of visual aids and hand-outs used during the meeting.

Principal subjects of concern identified during the meeting and, in some cases, noted as agenda items for the full comittee meeting include:

(1) Applicant's description of facility and changes in facility design since CP review.

(2) The applicant's schedule and organization for niant oceration.

(3) Staff report on coccarison of Cavis-Besse, Unit 1 and Three ' tile Island, Unit 2.

(4) Staff report on coments in AC3S report dated (3/2'/70).

(S) Staff report on outstanding review items and the applicant's restonse.

I (6) Staff report on unresolved generic issues (ACRS report No. a, dated

~

4/16/76).as related to other B & W reactors.

(7) Apolicant's review of containment vessel paint problems (8) Applicant's presentation for system interactions. (both normal operation and as a result of accidents).

v _

O F ric.

  • suwAasE D

.. v..

foran AEC.318 (Rev. A53) AECM 0240 W u. se oovsamassar eninvine orsti a

74 sa toe

s 2

Toledo Edison Conpany 2-(9) Applicant's presentation for facility emergency plans.

'(10) Industrial Security The Subcomittee has indicated it would recomend to the full Comittee that their review of this. application be continued at the full Committee

, meeting scheduled for January 6,1977.

OPIsinal signed bf Leone. Ecgle L. Engle, Project "anager Light Water Reactors Branch No. 1 Division of Project Managenent

Enclosure:

as stated cc: Toledo Edison Company ATT'l: !!r. Lowell E. Roe Vice President, Facilities Development Edison Plaza 300 tiadison Avenue Toledo, Ohio 43652 Fr. Donald H. Pauser, Esq.

The Cleveland Electric Illuminating Company P.O. Box S000 Cleveland, Ohio 44101 Gerald Charnoff, Esq.

Shaw, Pittman, Potts and Trowbridge 1300 M Street., N.W.

Washington, D.C.

20036 Leslie Henry Esq.

Fuller, Seney, Henry and Hodge 300 Madison Avenue Toledo, Ohio 43604 orrics >

_ _~

summa us >

y oarsh

.. M-Fesma AEC 118 (Rev. b55) ABCM 0240 W u. s. oovanmusur rainveme oprics: sen.sae. nee

~

N FOR DAVIS-BESSE UNIT 1 p

SeccmITrEE mrrna u

WN5HDGIW, DC D e 21, 1976 s

~

r 8:30 a.m.

1.0 Executive Session (open) 9:00 a.m.

2.0 Meeting with Applicant and NRC Staff (Open) 2.1 Introduction by Applicant (20 minutes)

Brief plant description and changes since CP review Fuel load / operation schedule Organization / staffing for operation 2.2 NBC Staff Report y

Strmary of SER and status of review Resolution of cocoents in ACRS rej;crt dated 8/29/70 2.3 Outstanding Review Ite:s (6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />)

Status of each outstanding issue (NRC Staff)

Response (Applicant) 1 Status of unresolved generic iten:s (ACPS Report #4, t

dated 4/16/76) as related to other B&W reactors (NRC Staff) j i

2.4 Presentation by Applicant (40 minutes)

Review of contain:nent vessel paint problems Status of :nodified surveillance speci~.en tube bolders Icng term cooling capability without use of BOP cocponents; steam generators; a.c. power Other items requested by Subco::nittee or Applicant P

4

f g

t t

Davis-Besse 1 -

2.5 Energency Plans (Applicant) (30 minutes)

Status of fire protection evaluation in compliance I

with Appendix A to Branch Tecnnical Position APCSB 9.5.1 Instrt=entation to follow the course of an accident U

Agreements with local and state agencies Ct11o respense plan 2.6 Plant Security (Cicsed) (20 minutes)

Procedures Operation features to ptevent sabotage 5:00 p.m.

3.0 Subco:mittee Caucus and Adjournment (Open) (10 minutes) 9 l

.j f

- 4 4

6 e

g f

s 4

+

l i

,s

... -~

MELI.NG

SUMMARY

DISTRIBUTION Docket File ':[

[E![

J. Knight D. Ross NRC PDR Local POR R. Tedesco TIC S. Pawlicki NRR Reading I. Sihweil LWR -1 File P. Check B. C. Rusche T. Novak E. G. Case Z. Rosztoczy R. S. Boyd G. Lainas R. C. DeYoung V. Benaroya D. Skovholt T. Ippolito J. Stolz V. Moore K. Kniel R. Vollmer O. Parr M. Ernst W. Butler W. Gammill D. Vassallo G. Knighton L. Crocker B. Youngbloc.

R. Clark W. Regan T. Speis D. Bunch P. Collins J. Collins C. Heltemes W. Kreger R. Houston R. Ballard S. Varga M. Spangler J. Miller J. Stepp F. J. Willimus L. Hulman R. Heinenan H. 991th H. Denton V. Stello D. Muller Project Manager Attqrney, ELD IEls)

d. Hylton NRC participants ACRS (16) t L.