JAN 2 61977 Docket No. 50-346 MEMORANDUM FOR:
J. Stolz, Chief, light Water Reactors Branch No.1 FRGM:
C. -J. Heltemes, -dr., Chief, Quality Assurance Brt.nch, PM
SUBJECT:
DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO. 1 - REVISIDN NO. 25 TO FSAR
'a'e have evaluated Section 17.2 of Revision No. 26 to the FSAR for Davis-Besse Nuclear Power Station Unit No.1.
We find that this revision does not degrade the quality assurance progran previously accepted (Skovholt/Vassallo, August 30, 1976 memo transmitting updated SER for Section 17.2) and that quality-related activities are to be controlleri in accordance with the requirements of Appendix 3 to 10 CFR 50.
We conclude that the QA program as described in Section 17.2 of the FSAR, through Revision 26, is acceptable for the operations of Davis-Besse Unit No.1.
Original signed by:
C. J. Heltemes, Jr.
C. J. Heltames, Jr.. ' Chief Quality Assurance Branch Division of Project Management DISTRIBUTION:
N Central Files _
NRRReading QAReading DJSkovholt QADocket CJHeltemes,Jr.
JWGilray AGarland JConway Lengle
,,/
KGoller Pg8
)M:QA _, __ PM-QAp
..ric a,
JCogay:cah JWGi1r CJHe14 emes.,Jr 1/h/77 IL(k/77 1]M/77 Torum AEC.3ta (Rev. 9 53) ABCM 0240 W u. e. oovanmusme eninvine orrican sera.see.see 8 o os o s0754
,