ML19329B542

From kanterella
Jump to navigation Jump to search
Forwards RO NP-32-77-06
Date released: 12/09/2019 Download: ML19329B542


RO NP-32-77-06:on 770711,during Valve Lineup on Decay Heat Loop 1-2,flowpath Inadvertently Established Between RCS & Borated Water Storage Tank.Caused by Personnel Error in Valve Lineup.Pump 1-1 Started to re-establish Flow Rate
ML19329B619
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/20/1977
From: Batch S, Lingenfelter J
TOLEDO EDISON CO.
To:
References
Download: ML19329B619 (4)
Forwards RO NP-32-77-06
ML19329B541
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/20/1977
From: Roe L
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19329B541 (1)