ML19329B426

From kanterella
Jump to navigation Jump to search
Notifies That Applicants Intention to Duplicate Units 1 & 2 Design Info for Unit 3 Is Not Permissible & May Delay SER Input from Certain Branches
ML19329B426
Person / Time
Site: Davis Besse  Cleveland Electric icon.png
Issue date: 07/21/1976
From: Ippolito T
Office of Nuclear Reactor Regulation
To: Panzarella J
Office of Nuclear Reactor Regulation
References
NUDOCS 8002050632
Download: ML19329B426 (1)


Text

b

"$h 3,-

-m So - 3%

NOTE TO:

J. Panzarella SER FOR DAVIS BESSE UNITS 2 AND 3 Recent Revision Ntaber 8 dated June 18, 1976, of the SAR for Davis Besse Units 2 and 3 has deleted some design inf urmation and has stated in its place that Units 2 and 3 will be duplicate of Unit 1.

Since this approach is not permissible under standardization policy, the A/D for Plant Systems will be in touch with DPM on this zatter. Until this matter is resolved, the EICSB (possibly other branches) cannot agree to a firm date for an SER input for Davis Besse Units 2 and 3.

7 Thocas A. Ippolito, Chief Electrical, Instrumentation and Control Systems Branch Division of Systems Safety cc:

M. Srinivasan D. Basdekas

[ DISTRIBUTION nocKcT FILES g

NRR READING D

EIC READING I

T. IPPOLITO g

fl Iy @

d R. TEDESCO i,

8 0 02 05ofe3p-EICS$:E5..

.E1CSB;PS _. EICS PS. _.

er ric=

  • QuD.

.F

~

DBardekW:mg JErinivasan.

lito_

su==^==*

. 7/.7_V76 _..__- -.2/_l-476 7 9 /.16 oar = >

Perim AECr$14 (Rev. ASS) ABCM 0244

  1. u. es eovsanusur reinvine oprics:ist4.ese tes