ML19329B420
| ML19329B420 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 07/23/1976 |
| From: | Nolan F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| To: | Knop R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| NUDOCS 8002050628 | |
| Download: ML19329B420 (1) | |
Text
.. ~
g3%
JA 2 3 W5 i
Docket No. 50-346
- 2. C. Knop, Csief, Reactor Proj'ects Section 1. Region III TdRU:
J. H. Saiszek, Chief, Light Water Reactor Prograus 3rsuch, IZ SENSOR CM TMTION REQUIRFME:ffSt DAVIS-BESSE 1, MRANNN DATED JWE 15,1976 As discussed with R. Mar in on July 22, 1976, the recernended action described in the subject memorandu:n is consistant with Iters 4.0.4, Surveillance acquirements of the Standard Technical 3pecifications for 3 & W facilities. Itan 4.0.4 statas t:iat "2ntry into an operational coda or other specified applicability conditiona shall not be made unless the surveillance requirement (s) associated trith t5o limiting condition for operation have been performd vithin the stated surveill.ince interval or as otherwise specified.
As a result, sensor calibrations must be performed within the surveillance interval described in the Technieni Specificatien prior to fuol losdtag.or recalibration is necessary. This re<suiretent applien to both certified and concertified calibrationa.
ki;inal Sl&Md M
. L Nella -
F. J. 2*olan Light Water Reactor Protrams Eranch, 13 cc:
- 2. D. Martin, 52C-III 80020H M F30200H1 RIP-770 l
i
)
o rrec s >
l{glWB 1K;1NR l
FJNolantj r_.__ JBSniezek _._.
oua 4 =
- 7/dh.76_
7/2 76 oave
- Foran AIC.)ts (Re 9 33) AECM 0240
- u. s. sovena-ant paintiae orricas se74.sames.
l
,