ML19329B415
| ML19329B415 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 08/23/1976 |
| From: | Shapaker J Office of Nuclear Reactor Regulation |
| To: | Kiessel R Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8002050625 | |
| Download: ML19329B415 (1) | |
Text
.
k-fd&? f~h" DISTRIBUTION:
Docket Files NRR Reading CSB Reading B D - 2^ %
MEMORANDUM FOR:
R. Kiessel, Mechanical Engineering Branch, DSS FROM:
J. W. Shapaker, Section 3 Leader, Centainment Systems Branch, DSS
SUBJECT:
CONTAINMENT PURGE ISOLATION VALVES, DAVIS DESSE, UNIT 1 T;1e applicant has indicated his intention to use the contaiment purge system during plant operation. The purge system isolation valves, wnich are listed in Table 6-8 as contaiment isolation valves and receive signals to close in the event of an accident, cust, therefore, be considered " active valves." Figures 6-5 and 6-6 in the FSAR, indicate the worst pressupe and temperature transient expected in the containment for the 14.14 f t hot leg DBA. The valve should be assumed to be fully closed 10 seconds after the LOCA. 9e have based our review of the applicant's proposed use of the contaiment purge system on the assumption that the isolation valves will be capable of closing during the transient referenced in the above figures.
If during the course of your review of the operability of the purne system isolation valves it becomes evident that the above assumption is not warranted, please contact D. Pickett as soon as possible.
J. W. Shanaker, Section Leader 3 Containment Systems Branch Division of Systens Safety cc:
J. Knight G. Lainas L. Engle J. Pickett file: 061 Iu, Ccntact:
A D. Pickett, CSB v
-A Q
Tele. No. 27711 i
)
PS:CSB.
. PS C,SB -
[ CSB or
'e.,
DPic.kett:mc...)Sha pa k.er__
....i na s
.u.-.,
.8/h.J76.. -.
8L3.D6 8Li,cD6 Form MC.318 (Rev. 9-53) MCM 02+0 W v. se oovspuusnr ensurine orricas iera.sas nee 800205obn