| Site: | Davis Besse |
| Issue date: | 06/21/1976 |
| From: | Sniezek J Office of Nuclear Reactor Regulation |
| To: | Stolz J Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19329B404 | List: |
| References | |
| NUDOCS 8002050615 | |
| Download: ML19329B407 (1) | |
Text
e *,a ~ ' ' ~<
um t w r.;;. ' ';
-fg
't NUCLEAR REGULATORY CC.*.WldlO' 1
p(f... )~v-.;l, j i 4 '.
WASHINGTCtt, D. C. 20055
~:,.,lVI JUN 2 1 076 i
l J. F. Stolz, Chief, Light Unter Reactors Branch lio. 1, Division of Project Management, NRR 1
PR000 SED REVISIO!! TO DAVIS -EESSE I FSAR TEST AESTRACT; " LOSS OF STATION AIR TEST" As was recently communicated to L. B. Engle by R. J. Vogt-Lottoll of my staff, Revision 17 of the Davis-Besse Unit I TSAR has incorporated j
a revision of the " Station Response to Locs of Inntrunent Air Test" test procedure abstract whereby air prosaure to the individual air operators is reduced rather than shutting doun the system headers as l
was previously scritten.
The verification by the licensce of tihich air operators are fed from the various air system headers would be eliminated by this revision to the test.
We recommend that in the revieu of this test you include a consideration that the licensco verify that the air operators on safety reisted equip-ment are connected to systen air headers in accordance with design 1
drawings as part of this prooperational test activity. If you should need any' clarification on our recommendations, feel free to contact R. J. Vof t-Lowell or me on 492-7451.
f O
l W
fQ 1%c92.I'l JJ H.Snic:ck,.$hief Vight Water Reactor Programs Branch, IE cc: