ML19329B407

From kanterella
Jump to navigation Jump to search
Requests Consideration of Util Revision to Loss of Station Air Test in Test Review.Licensee Should Verify Which Air Operators Feed from Various Air Sys Headers
ML19329B407
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/21/1976
From: Sniezek J
Office of Nuclear Reactor Regulation
To: Stolz J
Office of Nuclear Reactor Regulation
Shared Package
ML19329B404 List:
References
NUDOCS 8002050615
Download: ML19329B407 (1)


Text

e *,a ~ ' ' ~<

um t w r.;;. ' ';

-fg

't NUCLEAR REGULATORY CC.*.WldlO' 1

p(f... )~v-.;l, j i 4 '.

WASHINGTCtt, D. C. 20055

~:,.,lVI JUN 2 1 076 i

l J. F. Stolz, Chief, Light Unter Reactors Branch lio. 1, Division of Project Management, NRR 1

PR000 SED REVISIO!! TO DAVIS -EESSE I FSAR TEST AESTRACT; " LOSS OF STATION AIR TEST" As was recently communicated to L. B. Engle by R. J. Vogt-Lottoll of my staff, Revision 17 of the Davis-Besse Unit I TSAR has incorporated j

a revision of the " Station Response to Locs of Inntrunent Air Test" test procedure abstract whereby air prosaure to the individual air operators is reduced rather than shutting doun the system headers as l

was previously scritten.

The verification by the licensce of tihich air operators are fed from the various air system headers would be eliminated by this revision to the test.

We recommend that in the revieu of this test you include a consideration that the licensco verify that the air operators on safety reisted equip-ment are connected to systen air headers in accordance with design 1

drawings as part of this prooperational test activity. If you should need any' clarification on our recommendations, feel free to contact R. J. Vof t-Lowell or me on 492-7451.

f O

l W

fQ 1%c92.I'l JJ H.Snic:ck,.$hief Vight Water Reactor Programs Branch, IE cc:

L. B. Engle, DpM, NRR R. D. !!artin, IE:III R. J. McDermott, h7R 1D ILUL 80020505 6 6

,