ML19329B372

From kanterella
Jump to navigation Jump to search
Requests Placement of Facility on Weekly Status Rept W/ Special Emphasis on Unresolved Items
ML19329B372
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/01/1976
From: Boyd R
Office of Nuclear Reactor Regulation
To: Grossman M, Heineman R, Vassallo D
NRC COMMISSION (OCM), Office of Nuclear Reactor Regulation
References
NUDOCS 8002040789
Download: ML19329B372 (1)


Text

3 October 1,1976 PQp 0f,g 0 'Q~T n

S_I 6

V tiOTE TO Ccm Vassallo p'h,g)

Bob Heineman Milt Grossman DAVIS-BESSE UtilT 1 Don: Please out Davis-Besse 1 on the weekly status report with stecial enoNsis on the itets of review, including Tech Soecs, that remain outstanding, and tell how they are beir resol ved. Uith t* e slio in the ACRS reeting to Decerter, we have run out of maneuvering room, even for a February POD.

I would like the necessary effert put forth, to cocolete this review in tire for the Decerber reetinc.

Dcb: Please take a look at the raview status for this proiect to nake sure that additional natters, unless they can be deferred logically, step crawling out of the woedwork.

tilt: At sc.Te point shortly we will need the good office of GELD to wran uo this review in time for the projected fuel lead date. Please help us out.

Origiralsigned by Roger S.Boyd Pocer S. 2cyd, Director Divisien of Project Mana'ic' ent cc:

3. C. Rusche E. G. Case F. Schroeder DISTRIBUTION:

H. R. Centen Central Files J. Knight NRR Rdg File D. Ross RSBoyd Rdg File R. L. Tedesco J. Stol:

L. Engle 8o020doygh

D,I R _._

opric s >

RSBpygeai_

10/1/76 em.

para AEC 31s (Rev. 7-53) AMM 9240 W w e.eavenmaseser reistime opes'2es eere.eee see

.