NRC ponu 195
~
U.C. NUCLEAn REGULATOMY MMMISSiCN OOCKET NUMLER 42 76) 50.144 WRC DISTAL,BUTION roR PART 50 DOCKET MATERI Al.
TO:
FROM:
DATE OF DOCUMENT Toledo Edison Company 11/23/76
!!r. John F. S tolz Toledo, Ohio DATE RECEiv9o Mr. Lowell E. Roe 11/29/76 gLETTc. R ONOTORIZED PROP INPUT FORM NUMBER OF COPIES RECEIVED JfoRiceN AL
}lyNCLA33 plEo DCCpY One signed OESCRIPTION ENCLOSU RE Ltr. re their conference call of II/l4/76 and our 11/9/76 ltr....regarding separation criteria for safety related redundant electrical Cable conduits.
(2-P)
PLANT NAME:
Davis-3 esse SAFETY FOR ACTION /INFORMATION FNvTttn 12 / l/-
33b I,psergvED An.
I I i
.cev - n an.
SNJiCILCHIII-3t 12 X
"MNO3 MITF"-
"i ^ '
P M ECT M iCER.
L. 2n:le k
PROJECT MANAGER:
P. Cota l.1C. ASST. ;
Mylt n LIC. ASST. !
INTERN AL DISTRIBUTION p.EGy SYSTEMS SAFETY I
PLANT SYSTEMS SITC SAZEJY_&
XD 0 FDR REINEMAN TED_ES_C.O E!:VIRQ_ m LY. SIS X I&E SCHROEDER RENAR9YA X. DZNTON & Mt;r Trn KOELD u TNAR COSSICK & STAFF ENGINEERING IPPOLITO EhTIRQ_IECII.
XMI2C MACARRY 12RKWOOD ERNST X' CASE X KNIGHT B A[l.ARD 1!!ANAUER Y
SI.lf4E_IL OPERATING REACTORS SPANCLER HARLESS V
PAWLJCKI STELLO SITE TECI_I, PRCJECT !!ANAGEMENT REACTOR SAFETY OPERATING TECH.
M CAle(ILL (2 -)._
BOYD X ROSS EISENHUT M
STEPP I
P. CUU.TNS NOVAK SIIAQ g HULMAN Il0USTC'i X
ROSZTOCZY
_EAER
- PETERSON, Y CHECK
__ BtfrLER SITE ANALYSIS
___ MELT._,
GgngS_
%,VOLLMER_
[IlELTE!!ES AT &..I M
IMINCH
__ SALTZMAN
% J. COLLINS gS30Vl80LT PilT" ERG V
ICRECER 55Ei Pt. CiTn ton F~iaT. J.A8; A'iL _
N _)m007U WE*i,1{AT.. LAH.
t X T EitN A1. UIS rillBU TICI CONTliOL NUMBE H
. I
.__nstC I). ) UR-JA o y 7, h,, ; !
TIC _.
rec.v,IE tiLRIKSQtL(ORitLL i
A S!.!!:
CONst;LTANTS -
e M
b T *.gM / //._ _
____..._....'l iMCns /d cyS
,:/ ;E
[]
..L_
.... _.,. ~,,,
8002040141
g TOLEDO E s ISON O,
WELL E. RCE Docket No. 50-346 V8tg ees. dent
/.g \\
/
Facsht Oevoicoment N
r4tsi
-sa42 November 23, 1976 M
Serial No. 157 h29194A
' Cy k
b
/\\/
\\\\
Director of Nuclear Regulation j
Attn:
Mr. John F. Stolz, Chief Light Water Reactors Branch No. 1 Division of Project Management United States Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Stolz:
This letter documents our conference call of November 19, 19 76, in responsa to your letter of November 9, 1976, regarding the Davis-Besse Nuclear Power Station Unit 1 separation criteria for safety related redundant electrical cable conduits.
Toledo Edison will comply with the intent of the subject separation criteria for safety related redundant electrical cable conduits. As was outlined in our conference telephone call, we are immediatt'y under-taking the following action:
1.
Conduit carrying redundant safety related cable will be separated by at least 1" wherever it is feasible.
2.
Such conduit not capable of 1" separation will be separated as much as possible, but in no circumstances be allowed to contact each other, and will be given a nominal minimum separation of approxi-mately 1/8".
Conduit locations with less than 1" separation will be tagged for future reference.
3.
An analysis and tests will be performed to assure that where there is less than a 1" space between conduits, that there is no detri-mental degradation of safety related circuits in conduit from the most limiting fault condition which could occur in an adjacent conduit carrying a redundant safety related circuit.
Such analysis and tests will be performed using electrical overload and short-circuit parameters bounding the potential exposures.
5 w
THE TCLEDO EDISCN COMPANY ECISON PLAZA 300 MADISCN AVENUE,,,TOLECp. CHIO 43652 1.u.) c c
o
- s Director of Nuclear Regulation Page 2,'
Novecher 23, 1976 e
4.
Should the results of the analysis and tests indicate that less than 1" spacing without barriers between conduits carrying safety related redundant electrical cables is not adequate to prevent detrimental degradation, protection will be assured by (1) barrier installation or (2) modification of conduit supports or rerouting to obtain 1" spacing or spacing adequate to permit barrier instal-lation.
We are confident that this approach will assure the integrity of safety related redundant electrical cable conduits found to be in contact or in close proximity to each other.
FSAR, Revision 24, to be submitted within two weeks will reflect this commitment.
Yours very truly, LER:ss j